Skip to main content

Ending tolling on Texas roads ‘would come at a high price’

Eliminating tolls on state highways throughout Texas would be prohibitively expensive, state legislators who are considering such a plan have learned, says the National Council for Public-Private Partnerships. Texas Department of Transportation (TxDOT) undertook research how much it would take to eliminate the highways for which it is responsible. It estimates the price of removing tolls on those highways would be at least US$24.2 billion and would increase over time, TxDOT executive director James Bass
September 12, 2016 Read time: 2 mins
Eliminating tolls on state highways throughout Texas would be prohibitively expensive, state legislators who are considering such a plan have learned, says the National Council for Public-Private Partnerships.

375 Texas Department of Transportation (TxDOT) undertook research how much it would take to eliminate the highways for which it is responsible. It estimates the price of removing tolls on those highways would be at least US$24.2 billion and would increase over time, TxDOT executive director James Bass told lawmakers in late August, reported the Houston Chronicle.

The department’s cost estimate is based on the state’s outstanding debt and the additional costs of buying back bonds that were sold by 2016 to build toll roads. The final cost of ending tolls is subject to change, however, based on when the highways are paid off and the amount of additional accrued interest the state owes.

Eliminating tolls on the Grand Parkway alone through a single payment at the beginning of 2017 would cost about US$3.6 billion, roughly US$400 million more than the state paid to develop the project, said Bass.

Despite widespread complaints from motorists about the cost of using the toll roads, traffic on them is increasing rapidly. By the end of the 2016 fiscal year, the state had collected US$54.2 million in tolls, US$19.2 million more than TxDOT had estimated.

Meanwhile, new toll lanes along Texas 249 and a direct connection with the Sam Houston Tollway are said to have improved travel times.

The state could find it difficult to allocate the money to end tolls in any case. Voters recently approved new expenditures of up to US$3 billion for state highway projects but none of it can be spent to build or eliminate toll roads.

For more information on companies in this article

Related Content

  • NSW commits major funds to roads and maritime in 2013-2014 state budget
    June 20, 2013
    The New South Wales (NSW) Government will invest US$4.7 billion to build and maintain critical road and maritime infrastructure across the state in the 2013-2014 state budget, providing for new roads infrastructure, maintenance and road safety. Roads minister Duncan Gay says this new infrastructure fund, Restart NSW, will support the WestConnex Motorway, WestConnex enabling works in the Port Botany and Sydney Airport Precinct, the Pacific and Princes highways, Bridges for the Bush, and addressing congestion
  • Economic crisis needs non-partisan perspectives to stimulate growth
    February 2, 2012
    Kary Witt, President of the IBTTA and Pat Jones, Executive Director and CEO, talk about the need to put aside partisan perspectives in order to deal with the current economic crisis
  • Test 7th January 2016 News 1
    January 6, 2016
    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniamLorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam
  • Auckland considers road user charging to plug funding shortfall
    October 29, 2014
    Auckland, New Zealand, faces a US$9.5 billion transport funding gap to build the fully-integrated transport network set out in the 30-year Auckland Plan that includes new roads, rail, ferries, busways, cycle-ways and supporting infrastructure needed to cope with a population set to hit 2.5 million in the next three decades. If Auckland opts to pay for the fully-integrated Auckland Plan, Auckland Council officials claim the transport network congestion is expected to improve by 20 per cent over the next 1