Skip to main content

Egis Projects-Sanef consortium sign second major ORT operations contract in Canada

A consortium composed of Egis Projects and Sanef has signed a contract for the operation of the Port Mann Bridge open road tolling (ORT) project in the Metro Vancouver Area, Canada. The largest transportation infrastructure project in British Columbia history, it includes doubling the capacity of the bridge and widening the highway from Vancouver to Langley, a distance of 37 kilometres. Once complete, it will reduce travel times by up to 30 per cent, and save drivers up to an hour a day. The new bridge will
April 2, 2012 Read time: 2 mins
A consortium composed of 533 EGIS Projects and 480 Sanef has signed a contract for the operation of the Port Mann Bridge open road tolling (ORT) project in the Metro Vancouver Area, Canada. The largest transportation infrastructure project in British Columbia history, it includes doubling the capacity of the bridge and widening the highway from Vancouver to Langley, a distance of 37 kilometres. Once complete, it will reduce travel times by up to 30 per cent, and save drivers up to an hour a day. The new bridge will also provide for a Highway 1 Rapid Bus service.

The Port Mann / Highway 1 improvement project includes the construction of a new ten-lane bridge which will be equipped with an all electronic tolling (AET) system. Since 2009, Egis Projects and Sanef, within the V-Flow consortium, have operated the Golden Ears Bridge, with a similar AET system, on behalf of 376 TransLink, the Metro Vancouver regional transportation organisation.

Egis Projects and Sanef are equal shareholders of the Trans-Canada Flow Tolling consortium which won the ORT service contract, against eight other bidders, from Transportation Investment Corporation, the public concessionaire of the Port Mann bridge. The AET system is planned to be operational from December 2012 and more than 130,000 vehicles a day are expected to cross the Port Mann Bridge.

For more information on companies in this article

Related Content

  • UK defaults to hard shoulder running to expand motorway capacity
    April 8, 2014
    Hard shoulder running has become the UK’s default response to increasing motorway capacity as Colin Sowman reports. Facing a predicted 46% increase in traffic levels by 2040 and the current economic recovery leading to more people travelling to, from and for work leaves the UK government under short- and long-term pressure to increase the capacity on the main motorway network. Particular sections of motorways are already experiencing repeated, sometimes tidal, congestion and both tight Treasury limits and t
  • Brazil opts for freeflow tolling
    April 9, 2014
    David Crawford explores the technical background of Brazil’s First multi-lane free-flow tolling system. The 2013 opening of Brazil’s first fully-operational, all-vehicle, multi-lane free-flow (MLFF) tolling system in the state of São Paolo has set the scene for a new phase of modern electronic fee collection (EFC) deployment in Latin America’s largest country. It has toll programmes at both federal and state levels, with São Paulo – the most populous state, with the largest road network – leading in the awa
  • Rhode Island installing wrong-way driver signing
    November 21, 2014
    Rhode Island Department of Transport (RIDOT) is undertaking a US$2 million project to upgrade the signing and striping at 145 locations, more than 200 actual ramps, and install detection systems at 24 high-risk areas. The systems not only alert a driver who travelling in the wrong direction, they notify police and other motorists of a potential wrong-way driver. At the two dozen high-risk areas, most in the Providence metropolitan area, new detection systems will sense if a driver has entered a highway o
  • Nairobi looks to ITS to ease travel problems
    March 6, 2018
    Shem Oirere looks at plans to tackle chronic congestion in the Kenyan capital - where commuters can typically expect it to take up to two hours to complete a 15km journey. Traffic jams in the Kenyan capital, Nairobi, are estimated to cost the country $360 million a year in terms of lost man-hours, fuel and pollution. According to Wilfred Oginga, an engineer with the Kenya Urban Roads Authority (KURA), the congestion has been exacerbated by poor regulation and enforcement of traffic rules, absence of