Skip to main content

Egis Projects-Sanef consortium sign second major ORT operations contract in Canada

A consortium composed of Egis Projects and Sanef has signed a contract for the operation of the Port Mann Bridge open road tolling (ORT) project in the Metro Vancouver Area, Canada. The largest transportation infrastructure project in British Columbia history, it includes doubling the capacity of the bridge and widening the highway from Vancouver to Langley, a distance of 37 kilometres. Once complete, it will reduce travel times by up to 30 per cent, and save drivers up to an hour a day. The new bridge will
April 2, 2012 Read time: 2 mins
A consortium composed of 533 EGIS Projects and 480 Sanef has signed a contract for the operation of the Port Mann Bridge open road tolling (ORT) project in the Metro Vancouver Area, Canada. The largest transportation infrastructure project in British Columbia history, it includes doubling the capacity of the bridge and widening the highway from Vancouver to Langley, a distance of 37 kilometres. Once complete, it will reduce travel times by up to 30 per cent, and save drivers up to an hour a day. The new bridge will also provide for a Highway 1 Rapid Bus service.

The Port Mann / Highway 1 improvement project includes the construction of a new ten-lane bridge which will be equipped with an all electronic tolling (AET) system. Since 2009, Egis Projects and Sanef, within the V-Flow consortium, have operated the Golden Ears Bridge, with a similar AET system, on behalf of 376 TransLink, the Metro Vancouver regional transportation organisation.

Egis Projects and Sanef are equal shareholders of the Trans-Canada Flow Tolling consortium which won the ORT service contract, against eight other bidders, from Transportation Investment Corporation, the public concessionaire of the Port Mann bridge. The AET system is planned to be operational from December 2012 and more than 130,000 vehicles a day are expected to cross the Port Mann Bridge.

For more information on companies in this article

Related Content

  • Egis expands in Brazil
    November 28, 2014
    International engineering group Egis has furthered its development strategy with the acquisition of Sao Paulo-based engineering firm Lenc. The acquisition allows Egis to become one of the foremost engineering firms in Brazil, offering a comprehensive range of services in urban development, regional planning and multi-modal transport, whilst also consolidating its international business activities in one of the most promising countries in the world. Established in 1975, Lenc is one of the leaders in th
  • $268m FTA grant for San Antonio rapid transit
    January 3, 2025
    Via Rapid Green Line is planned to be up and running by late 2027
  • EETS: still struggling to become reality
    December 4, 2013
    Erich Erker, Norbert Schindler, Peter Tschulik from Siemens Electronic Tolling examine the barriers to EETS deployment. Tolling in Europe was introduced to pay for the construction and operation of individual tunnels, bridges and highways and has evolved in major steps. The original manual tolling systems were highly disruptive to traffic flow and required the creation of large toll plazas, with multiple lanes and toll booths to ensure an acceptable throughput. With the introduction of Dedicated Short Range
  • Cross border enforcement a logical step
    January 30, 2012
    The logic supporting a cross-border enforcement Directive for the European Union (EU) is both detailed and compelling. The White Paper on European transport policy published in 2001 included the ambitious objective of reducing by 50 per cent by 2010 the number of people killed on the roads of the EU. But since 2005 the reduction in the number of road deaths has been slowing down: overall, the period from 2001 until 2009 saw the number of fatalities decrease by 36 per cent. According to Community indicators,