Skip to main content

Egis awarded second Turkish motorway contract

French engineering and consulting group Egis has been selected by Turkish toll concessionaire Oyotol as its partner for the operation and maintenance of the Gebze-İzmir motorway in Turkey. The deal follows the award of the Eurasia tunnel in 2012. The Build, Operate and Transfer (BOT) project is being carried out on behalf of the Turkish General Directorate of Highways and is said to be the largest BOT project in Turkey to date. It includes 420 km of motorway (2x3 lanes) between Gebze on the North shore of
June 25, 2013 Read time: 2 mins
French engineering and consulting group 7319 Egis has been selected by Turkish toll concessionaire Oyotol as its partner for the operation and maintenance of the Gebze-İzmir motorway in Turkey.  The deal follows the award of the Eurasia tunnel in 2012.

The Build, Operate and Transfer (BOT) project is being carried out on behalf of the Turkish General Directorate of Highways and is said to be the largest BOT project in Turkey to date. It includes 420 km of motorway (2x3 lanes) between Gebze on the North shore of İzmir bay and İzmir, together with a 3000 m suspension bridge crossing İzmir bay, three tunnels with an approximate cumulative length of 6 km and twenty toll stations.

The project will be implemented in two phases.  The first 58 km phase from Gebze will include the Izmir bay suspension bridge, one of the longest suspension bridges in the world. Traffic for the first phase is forecast to be around 40,000 vehicles per day.  The second phase is scheduled to be operational in mid-2020.

For more information on companies in this article

Related Content

  • ITS boosts safety on Brazil’s Regis Bittencourt Highway
    October 5, 2016
    Brazil’s incident-prone Regis Bittencourt Highway was once known as ‘the highway of death’ but investment in ITS systems has brought about some big improvements, as Mauro Nogarin discovers Between 2010 and the end of 2014, Brazil made major investments in traffic technology across its national highways with the result that the ITS network went from 4,963km of fibre optics to 8,524km and the number of cameras increased from 1,127 to 3,208.
  • EETS: still struggling to become reality
    December 4, 2013
    Erich Erker, Norbert Schindler, Peter Tschulik from Siemens Electronic Tolling examine the barriers to EETS deployment. Tolling in Europe was introduced to pay for the construction and operation of individual tunnels, bridges and highways and has evolved in major steps. The original manual tolling systems were highly disruptive to traffic flow and required the creation of large toll plazas, with multiple lanes and toll booths to ensure an acceptable throughput. With the introduction of Dedicated Short Range
  • London’s strategy to tackle air quality problems
    October 21, 2014
    Colin Sowman talks to Matthew Pencharz, the man charged with charting London’s path between catering for traveller needs, conserving ancient buildings and conforming to modern air quality standards.
  • Progress in talks on new Sydney toll road
    October 10, 2013
    Toll roads operator Transurban says it has made good progress in its talks with the New South Wales government on a US$2.5 billion tunnel proposal for Sydney's north. The proposed project would be a tolled motorway linking the M1 Pacific Motorway, formerly the F3 freeway, at Wahroonga to the M2 toll road at West Pennant Hills. The project involves the construction of new eight kilometre tunnel, which would be the longest tunnel of its kind in Australia. “We have made significant progress in our disc