Skip to main content

Dubai’s Salik toll system wins International Toll Excellence Award

The International Bridge, Tunnel and Turnpike Association (IBTTA) has awarded the Roads & Transport Authority (RTA) of Dubai the prestigious 2014 Toll Excellence Award in Technology for its expansion of the Salik toll system, implemented by TransCore. The award was presented at IBTTA’s 82nd annual meeting in Austin, Texas. Already home to the world’s widest open-road tolling zone spanning seven lanes in a single direction, RTA’s objectives were to reduce growing traffic congestion, encourage use of alte
September 16, 2014 Read time: 2 mins
RSSThe International Bridge, Tunnel and Turnpike Association (63 IBTTA) has awarded the Roads & Transport Authority (RTA) of Dubai the prestigious 2014 Toll Excellence Award in Technology for its expansion of the 1700 Salik toll system, implemented by 139 TransCore. The award was presented at IBTTA’s 82nd annual meeting in Austin, Texas.

Already home to the world’s widest open-road tolling zone spanning seven lanes in a single direction, RTA’s objectives were to reduce growing traffic congestion, encourage use of alternative routes, and maintain open lane operations during maintenance and future expansions.

TransCore designed the original Salik toll system in 2006. For the expansion project, the Nashville-based company constructed three additional electronic tolling locations, consisting of six new toll gates and added several feature enhancements, including: above ground equipment using an innovative gantry design to reduce the effects of direct sunlight and protect against adverse wind conditions; real-time image processing over seven lanes of traffic to capture images of all vehicles travelling up to and in excess of 140 kph; and a sophisticated power system to ensure reliability during power or network failure.

The system expansion now enables the toll system to process more than three million transactions each day and traffic volumes have reduced up to 22 per cent during peak travel times, achieving the goals of the expansion.

“Our decision to first implement and then expand a free-flow toll system mirrors a trend around the globe to manage congestion through technology and likewise support economic growth throughout the Emirate,” said engineer and chief executive officer for the RTA Maitha Bin Adai.

“RTA had the foresight to provide a free-flowing, electronic tolling solution that can accommodate Dubai’s growing population,” said Karim Rizkallah, managing director, TransCore Middle East. “We are honoured to be their technology partner and congratulate them on this recognition from IBTTA.”

For more information on companies in this article

Related Content

  • Santiago metro contract awarded
    January 20, 2014
    Spain’s Isolux Corsán has been awarded a US$100 million contract for the construction of a section of line 3 of the Santiago Metro in Chile. The project, part of the Metro Project, aims to improve the entire underground network in Santiago includes the construction of a 3.7 kilometre tunnel under the Chilean capital and includes the construction of three stations, five circular shafts and two rectangular shafts over a period of 28 months. It is expected to start operating in 2018.
  • Keolis Amey Docklands to run Docklands Light Railway until 2021
    July 10, 2014
    Transport for London (TfL) has named Keolis Amey Docklands as the new franchisee of the Docklands Light Railway (DLR) to operate and maintain the network until April 2021, with an option for this to be extended until 2023. Around 100 million passenger journeys are made on the DLR network annually and this new contract, with a value in excess of US$1.2 million, will commence on 7 December 2014 and will see Keolis Amey Docklands work with TfL to ensure that passengers continue to see improvements to thei
  • LB Foster wins $60 million Honolulu rail contract
    July 27, 2012
    Pennsylvania-based LB Foster Company has been awarded the company’s largest rail products contract, valued at approximately US$60 million, by contractor Kiewit/Kobayashi, a joint venture for the county-wide construction of the Honolulu Authority for Rapid Transportation (HART) passenger transit system. LB Foster rail, concrete ties, direct fixation fasteners, third rail with accessories and special trackwork will be installed throughout the Honolulu Rail Transit project’s new elevated railway system and mai
  • AeroVironment to supply fast charge systems at Seattle-Tacoma International Airport
    May 9, 2012
    AeroVironment has announced the Port of Seattle has awarded the company a contract valued up to US$8.8 million through 2014 to supply its PosiCharge electric Ground Support Equipment (eGSE) fast charge systems to the Seattle-Tacoma International Airport. “This project will be a tremendous step toward our Century Agenda goal to reduce carbon emissions by 50 per cent from 2005 levels,” said Elizabeth Leavitt, planning and environmental programs director at Seattle-Tacoma International Airport.