Skip to main content

Developer selected for Dallas Airport freeway project

Traffic relief is on the way for North Texas motorists who rely on SH 183, the airport freeway in Dallas and Tarrant counties. The Texas Transportation Commission has awarded a contract to Southgate Mobility Partners to develop much-needed improvements on up to 28 miles of roadway. Listed in the Texas Department of Transportation's 100 Most Congested Roadways, segments of SH 183 are used by nearly 170,000 vehicles daily.
June 2, 2014 Read time: 2 mins
Traffic relief is on the way for North Texas motorists who rely on SH 183, the airport freeway in Dallas and Tarrant counties. The 5427 Texas Transportation Commission has awarded a contract to 7780 Southgate Mobility Partners to develop much-needed improvements on up to 28 miles of roadway. Listed in the 375 Texas Department of Transportation's 100 Most Congested Roadways, segments of SH 183 are used by nearly 170,000 vehicles daily.

The project, which will be built in phases, is expected to improve mobility by expanding around 28 miles of the freeway. The interim phase of construction, estimated at US$850 million, includes rehabilitation and replacement of deteriorating roadways and adding one managed Toll lane in each direction. The developer will provide 25 years of operations and maintenance. Construction is slated to begin on the interim phase at the end of 2014 with improvements completed by 2018.

The ultimate phase will include an additional general purpose lane in each direction, up to three managed Toll lanes in each direction and the completion of the Diamond Interchange at Loop 12/SH 183/Spur 482/SH 114. Funding for the ultimate project has not been identified.

"As we continue to face challenges with transportation funding, public/private partnerships such as this one will remain essential components for addressing our state's mobility needs and spurring our economic prosperity," said retired Lt Gen. Joe Weber, USMC, TxDOT executive director. "We are excited to see momentum on the airport freeway and hope to provide Texas drivers with some much-needed traffic congestion relief."

Related Content

  • What's next for traffic management and data collection?
    January 26, 2012
    As the technologies and stakeholders in traffic management evolve, what can we expect to see happening in the coming years? For many, the conversation of the moment is just how, and how far, the newer technologies and services provided principally by the private sector should be allowed to intrude into the realms of traffic management.
  • TransCore to upgrade Delaware River bridge toll system
    October 1, 2015
    The Delaware River Joint Toll Bridge Commission (DRJTBC) has awarded TransCore a US$24.9 million multi-year design-build-maintain contract for a complete overhaul of the agency’s toll collection system infrastructure. The modernisation project will include virtually every aspect of the agency’s toll system: manual cash collections, conventional toll-lane E-ZPass transactions, highway-speed open-road tolling, and future all-electronic tolling at the Scudder Falls replacement bridge.
  • Consortium selected for Maryland LRT project
    March 3, 2016
    The Purple Line Transit Partner consortium, comprising Fluor Enterprises, Meridiam Infrastructure Purple Line and Star America Purple Line has been selected preferred team to design, build, finance, operate and maintain the Purple Line project for the Maryland Department of Transportation (MDOT) and the Maryland Transit Administration (MTA). Located in the Washington Metropolitan Region, the project includes 21 stations along a 16-mile alignment through Montgomery and Prince George’s counties. The U
  • Reconnecting communities with infrastructure improvements
    January 7, 2025
    Hundreds of projects to reconnect US communities separated by roadways will launch in 2025. Mary Scott Nabers takes a look at a few of them and outlines what’s involved