Skip to main content

Developer selected for Dallas Airport freeway project

Traffic relief is on the way for North Texas motorists who rely on SH 183, the airport freeway in Dallas and Tarrant counties. The Texas Transportation Commission has awarded a contract to Southgate Mobility Partners to develop much-needed improvements on up to 28 miles of roadway. Listed in the Texas Department of Transportation's 100 Most Congested Roadways, segments of SH 183 are used by nearly 170,000 vehicles daily.
June 2, 2014 Read time: 2 mins
Traffic relief is on the way for North Texas motorists who rely on SH 183, the airport freeway in Dallas and Tarrant counties. The 5427 Texas Transportation Commission has awarded a contract to 7780 Southgate Mobility Partners to develop much-needed improvements on up to 28 miles of roadway. Listed in the 375 Texas Department of Transportation's 100 Most Congested Roadways, segments of SH 183 are used by nearly 170,000 vehicles daily.

The project, which will be built in phases, is expected to improve mobility by expanding around 28 miles of the freeway. The interim phase of construction, estimated at US$850 million, includes rehabilitation and replacement of deteriorating roadways and adding one managed Toll lane in each direction. The developer will provide 25 years of operations and maintenance. Construction is slated to begin on the interim phase at the end of 2014 with improvements completed by 2018.

The ultimate phase will include an additional general purpose lane in each direction, up to three managed Toll lanes in each direction and the completion of the Diamond Interchange at Loop 12/SH 183/Spur 482/SH 114. Funding for the ultimate project has not been identified.

"As we continue to face challenges with transportation funding, public/private partnerships such as this one will remain essential components for addressing our state's mobility needs and spurring our economic prosperity," said retired Lt Gen. Joe Weber, USMC, TxDOT executive director. "We are excited to see momentum on the airport freeway and hope to provide Texas drivers with some much-needed traffic congestion relief."

Related Content

  • Traffic to flow freely over world’s widest bridge
    November 13, 2012
    Pete Goldin reports on a new Egis project in Canada, providing open road tolling operations for the widest bridge in the world. A bridge can present a bottleneck in a system of roads or it can support the smooth and unobstructed flow of traffic. Much depends on the bridge design, surrounding infrastructure and tolling system. By adding lanes and deploying open road tolling (ORT), the new Port Mann Bridge located in the metropolitan Vancouver area in British Columbia, will alleviate congestion at one of the
  • Massachusetts DOT unveils five-year transportation plan
    January 14, 2014
    The Massachusetts Department of Transportation (MassDOT) has released the first draft of its five-year MassDOT Capital Investment Plan (CIP) for FY2014-FY2018. The US$12.4 billion program makes long-term investments and represents the first unified, multi-modal capital investment plan covering all MassDOT highway and municipal projects, regional airports, rail and transit, including the MBTA and Regional Transit Authorities. The proposal, which must be approved the state's Department of Transportation
  • Kapsch TrafficCom to provide toll system for US express lanes project
    January 10, 2017
    Kapsch TrafficCom has been awarded a contract by I-77 Mobility Partners to provide the toll system and system integration for the Interstate 77 Express Lanes project in Charlotte, North Carolina. The contract includes the design, installation and ongoing maintenance of the project’s field-level systems and is one of the first toll facility construction projects in Charlotte, intended to use modern managed lanes to relieve traffic congestion and provide reliable travel times, while also offering drivers a
  • Fluor consortium awarded Dutch motorway project
    October 6, 2016
    The 3Angle special purpose company, a consortium of Fluor, 3i Infrastructure and Heijmans Capital has completed the financing of the A27/A1 public private partnership (PPP) project in the Netherlands. The project is valued at more than US$246 million, which includes a 25-year management and maintenance period. 3Angle is responsible for the financing, design, construction, management and maintenance of the reconstruction of the A27 motorway between Utrecht North and the Eemnes Junction, as well as the A1