Skip to main content

Developer selected for Dallas Airport freeway project

Traffic relief is on the way for North Texas motorists who rely on SH 183, the airport freeway in Dallas and Tarrant counties. The Texas Transportation Commission has awarded a contract to Southgate Mobility Partners to develop much-needed improvements on up to 28 miles of roadway. Listed in the Texas Department of Transportation's 100 Most Congested Roadways, segments of SH 183 are used by nearly 170,000 vehicles daily.
June 2, 2014 Read time: 2 mins
Traffic relief is on the way for North Texas motorists who rely on SH 183, the airport freeway in Dallas and Tarrant counties. The 5427 Texas Transportation Commission has awarded a contract to 7780 Southgate Mobility Partners to develop much-needed improvements on up to 28 miles of roadway. Listed in the 375 Texas Department of Transportation's 100 Most Congested Roadways, segments of SH 183 are used by nearly 170,000 vehicles daily.

The project, which will be built in phases, is expected to improve mobility by expanding around 28 miles of the freeway. The interim phase of construction, estimated at US$850 million, includes rehabilitation and replacement of deteriorating roadways and adding one managed Toll lane in each direction. The developer will provide 25 years of operations and maintenance. Construction is slated to begin on the interim phase at the end of 2014 with improvements completed by 2018.

The ultimate phase will include an additional general purpose lane in each direction, up to three managed Toll lanes in each direction and the completion of the Diamond Interchange at Loop 12/SH 183/Spur 482/SH 114. Funding for the ultimate project has not been identified.

"As we continue to face challenges with transportation funding, public/private partnerships such as this one will remain essential components for addressing our state's mobility needs and spurring our economic prosperity," said retired Lt Gen. Joe Weber, USMC, TxDOT executive director. "We are excited to see momentum on the airport freeway and hope to provide Texas drivers with some much-needed traffic congestion relief."

Related Content

  • IBTTA’s roll-call of excellence
    September 2, 2022
    Winners of the IBTTA’s Toll Excellence Awards will be presented with their trophies during the 90th Annual Meeting & Exhibition in Austin, Texas
  • Virginia presses ahead with tunnels upgrade despite tolls challenge
    July 30, 2013
    David Crawford reviews current developments and legal/financial issues facing tunnel management in Virginia. This autumn the Virginia Department of Transportation (VDOT) in the US will defend its plan to introduce tolling on the Elizabeth River tunnels linking the cities of Norfolk and Portsmouth in the State’s Hampton Roads area. The tolling, which is due to start from February 2014, will be examined by the State’s Supreme Court later this year. The anticipated toll income, along with loans and bonds, is
  • Camera lowering poles aid maintenance, cut costs
    January 20, 2012
    It was while on vacation in Providence, Rhode Island that Jim Larsen had a Eureka! moment
  • First phase of Houston reversible HOV to HOT lanes completed
    June 19, 2012
    Houston’s Metropolitan Transit Authority of Harris County (Metro) working with prime contractor TransCore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilization of the HOV system and subsequently relieve congestion in the general purpose freeway lanes. When completed, the programme will span 135kms