Skip to main content

D'Artagnan to prepare road usage charge demonstration implementation plan for WSTC

D'Artagnan Consulting has been awarded a contract by the Washington State Transportation Commission (WSTC) to prepare a detailed state-wide road usage charge (RUC) demonstration implementation plan in preparation for a project expected to start in 2017. The company is working with Berk Consulting, WSP/Parsons Brinckerhoff and several DBE firms and the work will entail updating the WSTC body of materials assessing RUC since 2012 that was successfully completed at the direction of the State Legislature.
May 6, 2016 Read time: 2 mins

D'Artagnan Consulting has been awarded a contract by the Washington State Transportation Commission (WSTC) to prepare a detailed state-wide road usage charge (RUC) demonstration implementation plan in preparation for a project expected to start in 2017.

The company is working with Berk Consulting, 6666 WSP/4983 Parsons Brinckerhoff and several DBE firms and the work will entail updating the WSTC body of materials assessing RUC since 2012 that was successfully completed at the direction of the State Legislature.

The plan aims to address unanswered questions that remain through testing and evaluation with the intention of implementing the demonstration in 2017, with legislative approval. The implementation plan will be completed by the end of 2016 for review by the WSTC, the Governor's office, and the transportation committees of the State House of Representatives and the State Senate. It will include all details necessary to launch a RUC pilot test including agency roles, technologies and methodologies, procurement strategy, recruitment plan, rigorous evaluation criteria, a communications plan, and detail project expenditure budget.

The D'Artagnan team will also actively consult, coordinate and receive guidance from the Department of Transportation, the Department of Licensing, the Department of Revenue and the Office of the State Treasurer, as well as the WSTC appointed RUC Steering Committee in establishing participation and coordination parameters for the project.

Related Content

  • October 31, 2014
    Parsons Brinckerhoff wins consultancy services contract
    Engineering consultant Parsons Brinckerhoff has secured a nine-year contract with Somerset County Council in the UK to provide engineering consultancy services. Anticipated activity under the framework contract will cover a diverse range of services, including: transportation studies; design of transport improvement and maintenance schemes; environmental planning and consultancy; highways safety studies; structures inspections; and construction management. The contract has been drafted to enable othe
  • February 3, 2012
    Does enforcement merit a place in the EU's ITS action Plan?
    Colin Wilson, IBI Group, looks at the implications for enforcement of the European Commission's new Action Plan for the Deployment of ITS in Europe
  • March 2, 2012
    Need for standardisation of toll classes
    In a previous article Bob Lees of Idris Technology Ltd looked at the appropriateness of toll classes in relation to all-electronic toll fee collection. Here, he looks at how addressing classification standardisation could avoid downstream aggravation and cost
  • October 13, 2015
    Politicisation of US transportation funding
    Andrew Bardin Williams looks at how a political stalemate and a series of short-term fixes is undermining America’s highway funding and curtailing long-term planning. It was a week before the deadline to renew funding for the Highway Trust Fund, and the clock was ticking.