Skip to main content

Dart Charge goes live on 30 November

With the launch of Dart Charge set for 30 November, work to remove the toll booths will begin on Friday 28 November - the same weekend the new payment arrangements go live. Dart Charge means that drivers will no longer stop at a barrier to pay the charge. Instead, they will pay online, by phone, by post or in one of thousands of payzone retail outlets. The new payment arrangements will signal the start of major construction work to improve the road layout at the crossing, with 27 lanes of traffic reduced
November 14, 2014 Read time: 2 mins
With the launch of Dart Charge set for 30 November, work to remove the toll booths will begin on Friday 28 November - the same weekend the new payment arrangements go live. Dart Charge means that drivers will no longer stop at a barrier to pay the charge. Instead, they will pay online, by phone, by post or in one of thousands of payzone retail outlets.

The new payment arrangements will signal the start of major construction work to improve the road layout at the crossing, with 27 lanes of traffic reduced to four in each direction and a new safety system of traffic signals and barriers on the approach to the tunnels northbound, which will prevent over-height vehicles from entering the tunnels, hold traffic in case of an incident or congestion in the tunnel, and allow the safe release of vehicles under escort, such as hazardous loads.

The roadworks will continue until spring 2015 when drivers will feel the full benefit of the changes through quicker journey times. Until then drivers can expect some delays but all work is being planned to minimise disruption.  

503 Highways Agency project director Nigel Gray said: “The payment booths have been part of the Dartford landscape since 1963 but they contribute to congestion and cause delays. That’s why they are being removed and we are introducing a new payment system called Dart Charge. From 30 November drivers will no longer pay at the booths. Instead they will pay in advance or by midnight the day after crossing, helping to speed up journeys.”

For more information on companies in this article

Related Content

  • Mounting benefits of dynamic tolling project
    January 30, 2012
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was
  • Robotic Research: harnessing AV potential
    June 10, 2021
    Robotic Research is leading in AV R&D, from work with the US Army to enabling the first automated BRT line in North America: Gordon Feller assesses what the company is doing
  • WiM avoids bumps in the road
    May 5, 2020
    Road surfaces are deteriorating as years of budget squeezes bite among local authorities. Adam Hill asks leading Weigh in Motion players what effect this might be having on the accuracy of their technology – and how authorities can be made to see that WiM is a helpful tool
  • Great (shared) mobility expectations
    December 19, 2024
    An invitation to attend Movmi's Shared Mobility Fall Masterclass changed the way Adam Hill looked at micromobility - in particular his own attitude to risk