Skip to main content

Dart Charge goes live on 30 November

With the launch of Dart Charge set for 30 November, work to remove the toll booths will begin on Friday 28 November - the same weekend the new payment arrangements go live. Dart Charge means that drivers will no longer stop at a barrier to pay the charge. Instead, they will pay online, by phone, by post or in one of thousands of payzone retail outlets. The new payment arrangements will signal the start of major construction work to improve the road layout at the crossing, with 27 lanes of traffic reduced
November 14, 2014 Read time: 2 mins
With the launch of Dart Charge set for 30 November, work to remove the toll booths will begin on Friday 28 November - the same weekend the new payment arrangements go live. Dart Charge means that drivers will no longer stop at a barrier to pay the charge. Instead, they will pay online, by phone, by post or in one of thousands of payzone retail outlets.

The new payment arrangements will signal the start of major construction work to improve the road layout at the crossing, with 27 lanes of traffic reduced to four in each direction and a new safety system of traffic signals and barriers on the approach to the tunnels northbound, which will prevent over-height vehicles from entering the tunnels, hold traffic in case of an incident or congestion in the tunnel, and allow the safe release of vehicles under escort, such as hazardous loads.

The roadworks will continue until spring 2015 when drivers will feel the full benefit of the changes through quicker journey times. Until then drivers can expect some delays but all work is being planned to minimise disruption.  

503 Highways Agency project director Nigel Gray said: “The payment booths have been part of the Dartford landscape since 1963 but they contribute to congestion and cause delays. That’s why they are being removed and we are introducing a new payment system called Dart Charge. From 30 November drivers will no longer pay at the booths. Instead they will pay in advance or by midnight the day after crossing, helping to speed up journeys.”

For more information on companies in this article

Related Content

  • Variable message signs continue to deliver travel information
    February 2, 2012
    Arguably the 'face' of ITS, variable message signs are far from being a passing solution
  • FOTsis targets ‘socially inclusive’ cooperative ITS
    December 5, 2013
    The FOTsis project addresses the imbalances between the vehicular and infrastructure sides of cooperative ITS infrastructures and looks to ensure road operators can help to enrich future technology applications. By Jason Barnes. Several developments have conspired to push the vehicular side of cooperative infrastructures/cooperative ITS to the fore in recent years. The automotive industry’s rather shorter product development and lifecycles combined with economic slowdown in many regions gave rise to the not
  • Section of M6 motorway to be made ‘smart’
    November 1, 2013
    A section of the M6 motorway in the UK between junctions 10a and 13 is to be upgraded to a smart (managed) motorway with all-lane running. This section of the motorway is a major strategic route, carrying around 120,000 vehicles per day.
  • A new way to manage parking demand
    July 21, 2021
    Parking permit changes at one US campus could provide a model for encouraging active travel options post-Covid – and for transit ticketing adjustments as commuting patterns change