Skip to main content

Dart Charge goes live on 30 November

With the launch of Dart Charge set for 30 November, work to remove the toll booths will begin on Friday 28 November - the same weekend the new payment arrangements go live. Dart Charge means that drivers will no longer stop at a barrier to pay the charge. Instead, they will pay online, by phone, by post or in one of thousands of payzone retail outlets. The new payment arrangements will signal the start of major construction work to improve the road layout at the crossing, with 27 lanes of traffic reduced
November 14, 2014 Read time: 2 mins
With the launch of Dart Charge set for 30 November, work to remove the toll booths will begin on Friday 28 November - the same weekend the new payment arrangements go live. Dart Charge means that drivers will no longer stop at a barrier to pay the charge. Instead, they will pay online, by phone, by post or in one of thousands of payzone retail outlets.

The new payment arrangements will signal the start of major construction work to improve the road layout at the crossing, with 27 lanes of traffic reduced to four in each direction and a new safety system of traffic signals and barriers on the approach to the tunnels northbound, which will prevent over-height vehicles from entering the tunnels, hold traffic in case of an incident or congestion in the tunnel, and allow the safe release of vehicles under escort, such as hazardous loads.

The roadworks will continue until spring 2015 when drivers will feel the full benefit of the changes through quicker journey times. Until then drivers can expect some delays but all work is being planned to minimise disruption.  

503 Highways Agency project director Nigel Gray said: “The payment booths have been part of the Dartford landscape since 1963 but they contribute to congestion and cause delays. That’s why they are being removed and we are introducing a new payment system called Dart Charge. From 30 November drivers will no longer pay at the booths. Instead they will pay in advance or by midnight the day after crossing, helping to speed up journeys.”

For more information on companies in this article

Related Content

  • Traffic to flow freely over world’s widest bridge
    November 13, 2012
    Pete Goldin reports on a new Egis project in Canada, providing open road tolling operations for the widest bridge in the world. A bridge can present a bottleneck in a system of roads or it can support the smooth and unobstructed flow of traffic. Much depends on the bridge design, surrounding infrastructure and tolling system. By adding lanes and deploying open road tolling (ORT), the new Port Mann Bridge located in the metropolitan Vancouver area in British Columbia, will alleviate congestion at one of the
  • No in-road equipment for Queensland's free flow toll bridge
    February 1, 2012
    By May this year, the new Gateway Bridge in Brisbane, which is being built alongside an existing bridge, will be open. With it will come an end-to-end free-flow tolling system. Interview with Sue Caelers, Queensland Motorway Ltd. Queensland Motorways Ltd owns and operates 61km of roadway in the area around Brisbane, Australia. This includes the Gateway Bridge and the Gateway Extension, Logan and Port of Brisbane motorways.
  • Detroit transit authorities offer unified fare system for buses
    May 3, 2019
    The Detroit Department of Transportation (DDoT) has partnered with the Suburban Mobility Authority for Regional Transportation (SMART) to launch a unified payment system for the US region’s buses. Detroit’s mayor Mike Duggan says: “Dart will bring our two systems closer together with seamless transfers and more flexible payments making riding transit easier for everyone.” According to the mayor’s office, riders can take unlimited rides on both systems as each pass starts on the first use for the time
  • London launches new team to crack down on congestion
    November 30, 2015
    A new team of Road and Transport Enforcement Officers is being deployed to key traffic routes across London to crack down on illegal or inconsiderate behaviour and other problems that cause congestion. The new 40-strong Transport for London (TfL) team, which will rise to 80 by next spring, will help deal with problems such as illegal stopping or unloading of deliveries, which can cause delays to drivers and bus passengers. It will work closely with the TfL-funded Metropolitan Police Roads and Transpo