Skip to main content

Cintra, Meridiam-led consortium preferred proposer for Virginia’s toll project

The Commonwealth of Virginia, US, has named I-66 Express Mobility Partners as the preferred proposer for the Transform 66 Outside the Beltway project. The Cintra and Meridiam-led consortium will design, build, finance, maintain and operate the project, designed to relieve congestion, improve safety and provide more predictable travel times for Northern Virginia and the Washington, DC metro region.
November 7, 2016 Read time: 2 mins

The Commonwealth of Virginia, US, has named I-66 Express Mobility Partners as the preferred proposer for the Transform 66 Outside the Beltway project. The 5428 Cintra and 7905 Meridiam-led consortium will design, build, finance, maintain and operate the project, designed to relieve congestion, improve safety and provide more predictable travel times for Northern Virginia and the Washington, DC metro region.

The Transform I-66 Outside the Beltway Project extends 22 miles along the Interstate 66 corridor between US Route 29 near Gainesville in Prince William County and Interstate 495 in Fairfax County, with a total investment of more than US$3 billion.

The project includes three toll-free lanes in each direction and two express lanes in each direction with a state-of-the-art open-road electronic toll collection system. It will also provide direct access between the express lanes and new or expanded commuter lots, new and expanded transit service and park-and-ride lots and interchange improvements to enhance safety and reduce congestion, including auxiliary lanes between interchanges, where needed.

In addition to Cintra and Meridiam, I-66 Express Mobility Partners includes lead contractors 4419 Ferrovial Agroman US and Allan Myers.

For more information on companies in this article

Related Content

  • Fix 66 group applauds VDOT’s partnership finance option for I-66
    July 16, 2015
    Fix 66, a newly formed group to advocate for a managed lanes and bus rapid transit system to improve mobility in the I-66 corridor outside of the Capital Beltway, has applauded Virginia Department of Transportation’s (VDOT’s) announcement that they will advance a public-private partnership (P3) option for I-66 improvements to evaluate it with the previously announced public financing option. Fix 66 said, “We applaud VDOT’s decision to put the public-private partnership option on the table because maximi
  • HDR predicts an adaptable and flexible future for roadways
    December 19, 2016
    HDR consultants, Brian Swindell and Bernie Arseanea, consider managed lanes’ untapped potential. It is no surprise that corridor planning continues to challenge agencies and owners as demand continues to surpass roadway capacity.
  • Covid turns tolls cashless
    December 23, 2021
    When coronavirus hit, Pennsylvania Turnpike Commission made its long-planned e-tolling system permanent; this made sense, but it was still a difficult decision, explains the organisation’s Carl DeFebo
  • USDOT finances Ohio River Bridges East End Crossing
    April 17, 2015
    US Transportation Secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$162 million from the Department's Federal Highway Administration to finance the East End Crossing section of the Louisville-Southern Indiana Ohio River Bridges Project. At the total cost of US$1.27 billion, the East End Crossing includes the East End Bridge and its connecting roadways. The bridge spans the Ohio River eight miles to the north connecting the east end of Louis