Skip to main content

Canadian bridge features sophisticated tolling

In Canada a new private toll bridge that links Montreal with Laval is now open to traffic. The bridge was opened two months ahead of schedule and features a sophisticated electronic tolling system. Bridge users mount transponders to their vehicles to pay for each crossing.
May 16, 2012 Read time: 1 min
In Canada a new private toll bridge that links Montreal with Laval is now open to traffic. The bridge was opened two months ahead of schedule and features a sophisticated electronic tolling system. Bridge users mount transponders to their vehicles to pay for each crossing.

The bridge was built by a consortium comprising 802 Macquarie of Australia, 5566 Miller Paving and US-based 139 Transcore and Kiewit 4089 Parsons. This consortium has a concession to operate the bridge until 2042 when the structure will be handed to the Quebec Government. For the first 20,000 vehicles crossing the bridge/day, the consortium receives 100% of the toll revenue. The toll revenue from subsequent vehicles/day is shared equally with the road authorities in Quebec.

Related Content

  • January 30, 2012
    Toll performance exceeds expectations, improves travel times
    Jean Harito, Attica Tollway Operations Authority and Steve Morello, Egis Projects describe how looking to exceed contractual obligations makes good operational and business sense. The Attica Tollway is a modern, 65km, access-controlled urban motorway with three lanes in each direction. It constitutes the ring road around the extensive metropolitan area of the Greek capital, Athens, and forms the backbone of the entire road network in the Attica region. By ensuring freeflow operating conditions, the Attica T
  • April 2, 2012
    Egis Projects-Sanef consortium sign second major ORT operations contract in Canada
    A consortium composed of Egis Projects and Sanef has signed a contract for the operation of the Port Mann Bridge open road tolling (ORT) project in the Metro Vancouver Area, Canada. The largest transportation infrastructure project in British Columbia history, it includes doubling the capacity of the bridge and widening the highway from Vancouver to Langley, a distance of 37 kilometres. Once complete, it will reduce travel times by up to 30 per cent, and save drivers up to an hour a day. The new bridge will
  • March 2, 2012
    Reversible express lanes and open road tolling combat congestion
    Teri England, Diamond Consulting Services, details the construction of construction of a world first - reversible express lanes with cashless multi-lane ORT - on the Tampa Hillsborough Expressway