Skip to main content

California pilots road charge as alternative to fuel tax

As the California Road Charge Pilot Program enters its fourth month, participant feedback indicates that 65 per cent of 3,191 respondents surveyed are satisfied with the program as a whole. The nine-month pilot was launched on 1 July 2016 by the California Department of Transportation (Caltrans) to test a pay-by-the-mile road funding model as a possible replacement to the fuel tax. Over 5,000 vehicles state-wide are enrolled in the pilot, testing various road charging reporting methods to compare how the
October 17, 2016 Read time: 2 mins
As the California Road Charge Pilot Program enters its fourth month, participant feedback indicates that 65 per cent of 3,191 respondents surveyed are satisfied with the program as a whole.

The nine-month pilot was launched on 1 July 2016 by the 923 California Department of Transportation (Caltrans) to test a pay-by-the-mile road funding model as a possible replacement to the fuel tax. Over 5,000 vehicles state-wide are enrolled in the pilot, testing various road charging reporting methods to compare how the performance of each concept measures against an established set of criteria. Participants are not actually paying a road charge, but are making simulated payments based on the number of miles they drive each month.

Officials are looking at a road charge as a potential replacement for the fuel tax because revenues currently available for highway and local roads are insufficient for preserving and maintaining road infrastructure and reducing congestion. Increasing vehicle fuel efficiency means that fewer gallons of fuel are being purchased, but more cars are using California’s roads and the wear and tear on roads is increasing.

At the conclusion of the pilot, an independent third party will evaluate the pilot results and California State Transportation Agency will submit a report to the Legislature by July 2017 that includes those findings and summarises the pilot volunteers’ experiences and the stakeholder input received throughout all phases of the process.  The California Transportation Commission will then provide its recommendations to the Legislature in its annual report by December 2017. The Legislature will make the final decision on whether and how to enact a full-scale permanent road charge program.

For more information on companies in this article

Related Content

  • Smartphone - the next technology for charging and tolling?
    January 25, 2012
    With all the debates over the most suitable future technology or technologies for charging and tolling, is it not time for the industry to look at what the rest of ITS is doing and bring a rank outsider - the smart phone - closer into the fold? By Jack Opiola, D'Artagnan Consulting LLC
  • Public Private Partnerships to gather pace in the US
    April 29, 2015
    Public Private Partnerships are set to play a big role in transportation funding as Andrew Bardin Williams discovers. The old joke goes that the road from New York to Chicago is paved with potholes. For decades, drivers from New York and New Jersey traveling across Pennsylvania to visit the Midwest have lambasted the Commonwealth’s roadways for their lack of smooth pavement.
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • US DOT issues RFP for connected vehicle pilot deployment and program evaluation
    May 5, 2016
    The Federal Highway Administration (FHWA) has released a solicitation for a full and open competition to procure services for non-personal, technical support services for the Connected Vehicle Pilot deployment and program evaluation. The Connected Vehicle Pilot Deployment program includes three phases: Phase 1: Concept Development Phase, Phase 2: Design/Build/Test (for which this solicitation will ascertain that the objectives of the program are met), and Phase 3: Maintain and Operate.