Skip to main content

Bali launches first all-vehicle tolled highway

The launch of Bali’s first all-vehicle tolled highway on 23 September is expected to ease congestion in an area increasingly famous for its notorious traffic. The country already has a toll road especially for motorcycles. The project is designed to reduce congestion on the 12.7 kilometre Benoa-Kuta-Nusa Dua stretch, at a cost of US$217 million. The road runs over the sea and was built using 33,835 concrete columns, some of them through an area of mangrove forest.
September 25, 2013 Read time: 1 min
The launch of Bali’s first all-vehicle tolled highway on 23 September is expected to ease congestion in an area increasingly famous for its notorious traffic. The country already has a toll road especially for motorcycles.

The project is designed to reduce congestion on the 12.7 kilometre Benoa-Kuta-Nusa Dua stretch, at a cost of US$217 million. The road runs over the sea and was built using 33,835 concrete columns, some of them through an area of mangrove forest.

The Indonesian Toll Road Authority predicts that daily traffic will reach 39,000 vehicles per day, 56 per cent of which would be motorcycles.  Motorists will be able to pay using cash or electronic cards.

The highway will be operated by Jasa Marga Bali Tol under a 45-year concession and is forecast to break even in 15 years.

Related Content

  • Sice systems future proof Fehmarnbelt Tunnel
    April 4, 2023
    Picking up the electro-mechanical contract for the Fehmarnbelt Tunnel was a milestone, according to David Calero Monteagudo, head of global ITS and tunnel business for Spanish company Sice. David Arminas finds out more
  • IAM calls for greater education for smart motorway users
    April 14, 2015
    As smart motorways reach their first birthday in the UK this week, the Institute of Advanced Motorists (IAM) has expressed concern that widespread confusion still exists amongst motorway users on how best to use them. Smart motorways were officially introduced this time last year to replace Managed Motorways as the solution to the nation’s congested motorways but concerns have been raised over their safety. England’s first all-lane running motorway, i.e. without a hard shoulder, opened on the 2.5 km
  • Gothenburg’s year of congestion charging
    April 9, 2014
    A year after it went live, Colin Sowman examines the technology used for Gothenburg’s congestion charging system and the effect the scheme has had on commuters. When it comes to long-term planning, the Scandinavians take some beating.The West Swedish Agreement is a case in point. Introduced in 2009, the Agreement runs through to around 2027 and aims to create an attractive, sustainable and growing region, and over that timescale the number of journeys is expected to increase by a third. Therefore the Agreem
  • The great pay divide
    April 2, 2014
    Public acceptance is crucial for the acceptance of managed and express lanes as Jon Masters discovers. Lists of proposed highway expansion projects introducing variably priced toll lanes continue to lengthen. Managed lanes, or express lanes to some, are gaining support as a politically favourable way of adding capacity and reducing acute congestion on principal highways. In Florida, for example, the managed lanes on the 95 Express are claimed to have significantly increased average peak-time speeds on tolle