Skip to main content

Aselsan installs Macedonian corridor electronic toll system

Engineering company Aselsan has installed an electronic toll collection system on the 200km highway between the Serbian and Greek border. Aselsan says the Macedonian Corridor 10 Electronic Toll Collection System will prevent irregularities during transits. The system includes seven toll collection stations that were put in place during the installation and infrastructure preparation stages.
August 13, 2019 Read time: 1 min

Engineering company 19 Aselsan has installed an electronic toll collection system on the 200km highway between the Serbian and Greek border.

Aselsan says the Macedonian Corridor 10 Electronic Toll Collection System will prevent irregularities during transits.

The system includes seven toll collection stations that were put in place during the installation and infrastructure preparation stages.

For more information on companies in this article

Related Content

  • Developments in travel information display systems
    August 1, 2012
    David Crawford looks at recent developments in travel information display systems. It is important to remember that we are investing in Real-Time Passenger Information [RTPI] to increase ridership," says Robert Burke, Managing Director of New Zealand transit tracking technology specialist Connexionz, which has been involved in at-stop and remote passenger information since 1995. "Superior information improves the perception of public transport reliability and gives the passenger more choices and greater con
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • Kapsch awarded Polish GSM-R contract
    April 30, 2013
    Polish rail infrastructure manager PKP Polskie Linie Kolejowe (PKP PLK) has awarded Kapsch CarrierCom a US$12 million contract to design and install GSM-R equipment for the roll-out of European Rail Traffic Management System (ERTMS) on the 148 km Legnica - Wrocław - Opole section of corridor E30. The contract covers the expansion of existing base station controller (BSC) and transcoder unit infrastructure, together with the installation of thirty-two BTS 9000 base stations at sixteen locations. Kapsch is to
  • Kapsch TrafficCom IVHS publishes TDM specification to aid interoperability of electronic tolling
    October 24, 2012
    Kapsch TrafficCom IVHS has announced plans to help speed interoperability of electronic toll collection by publishing its Time Division Multiplexing (TDM) specification used in equipment supplied by Kapsch to the E-ZPass Group and other customers throughout North America. The move will provide developers and companies with open and free access to the Kapsch TDM specification and is the latest E-ZPass Group and Kapsch contribution to support interoperability and industry compliance with Moving Ahead for Prog