Skip to main content

Aselsan installs Macedonian corridor electronic toll system

Engineering company Aselsan has installed an electronic toll collection system on the 200km highway between the Serbian and Greek border. Aselsan says the Macedonian Corridor 10 Electronic Toll Collection System will prevent irregularities during transits. The system includes seven toll collection stations that were put in place during the installation and infrastructure preparation stages.
August 13, 2019 Read time: 1 min

Engineering company 19 Aselsan has installed an electronic toll collection system on the 200km highway between the Serbian and Greek border.

Aselsan says the Macedonian Corridor 10 Electronic Toll Collection System will prevent irregularities during transits.

The system includes seven toll collection stations that were put in place during the installation and infrastructure preparation stages.

For more information on companies in this article

Related Content

  • Funding shortfall for US Interstate upgrades
    May 11, 2012
    Andrew Bardin Williams investigates tolling on the federal Interstate system as maintenance and upgrade requirements increasingly outpace funding The I-95 corridor through North Carolina is one of the most heavy trafficked interstates in the US, seeing upwards of 46,000 vehicles per day in some stretches-and North Carolina’s Department of Transportation (NCDOT) estimates this number will to rise to 98,000 vehicles per day by 2040. Along with the rest of the federal interstate system, the North Carolina str
  • MassDoT dashboard reveals Covid impact
    September 15, 2020
    Commuters will be able to see data on traffic volumes and safety
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • Kapsch flows free in France
    December 2, 2022
    New toll system on A79 set to process 15,000 vehicles per day along 88km stretch