Skip to main content

ACS wins Los Angeles tolling contract

Affiliated Computer Services (ACS), a Xerox Company, has won a contract to deploy a new electronic toll system on two of the busiest highways in Los Angeles County. The new system will allowing toll rates to change based on traffic levels to help reduce highway congestion on the new 'ExpressLanes'.
March 2, 2012 Read time: 2 mins
Affiliated Computer Services (13 ACS), a 1689 Xerox Company, has won a contract to deploy a new electronic toll system on two of the busiest highways in Los Angeles County. The new system  will allowing toll rates to change based on traffic levels to help reduce highway congestion on the new ‘ExpressLanes’.

The 1795 Los Angeles County Metropolitan Transportation Authority (Metro) will convert portions of Interstate 10 and Interstate 110 from ‘car pool’ or high occupancy vehicle (HOV) lanes to ExpressLanes or high occupancy toll lanes, allowing people driving alone to travel in existing car pool lanes for a toll. To help manage traffic volumes, tolls for single passenger vehicles will vary based on the average speed of traffic travelling in the ExpressLanes. General purpose lanes will remain free for all vehicles.

Vehicles travelling in the new ExpressLanes must have a FasTrak toll account and a small transponder. Drivers will set a switch on their transponder so the toll system knows if they are driving alone and be charged; or part of a car pool and drive for free in the ExpressLanes. Sensors on the interstate will calculate any tolls and automatically deduct the proper amount from the driver’s prepaid account. The ExpressLanes will be designed to keep traffic moving at a minimum speed of 45mph.

Off the road, ACS will manage the customer service centre, and Xerox will provide additional expertise and efficiency for Metro in the printing and mailing of statements and notices.

Construction of the ExpressLanes Project is scheduled to begin by the middle of this year with the lanes scheduled to open to traffic in late 2012. ACS is on the project team led by 304 Atkinson Construction and includes 3525 AECOM and Steiny & Company

Related Content

  • Transportation infrastructure technology continues its advance
    July 17, 2012
    It is now 20 years since publication of the Strategic Plan for Intelligent Vehicle Highway Systems. A select group of luminary figures of the ITS industry give their assessment of progress to date This year the IVHS Strategic Plan turns 20, signaling the graduation of the field of Intelligent Transportation Systems from its tumultuous teens to young adulthood. After two decades tethered by the cords of youth and protected by the strict control of adult institutions, ITS has reached a turning point. Its y
  • IRD wins WIM contract in California
    March 28, 2012
    International Road Dynamics. (IRD) has been awarded a US$1.345 million contract to provide a high speed weigh-in-motion (WIM) and verification system for a new commercial vehicle enforcement facility (CVEF) in Solano County, California. This system will be used by local enforcement personnel for selecting and directing commercial vehicles into the CVEF and by Caltrans for traffic planning purposes.
  • Safe-driver training reduces costs, increases safety
    February 3, 2012
    Hermes, one of Europe's leading home delivery specialists, and part of the Otto group's European logistics division, estimates that introducing a range of safe-driving measures in its UK operations have contributed to a US$1.5 million cost saving to the business in the 12 months to April 2010.
  • LA metro secures federal funds for rail projects
    February 19, 2016
    The US Department of Transportation has awarded US$300 million to the Los Angeles County Metropolitan Transportation Authority (Metro) for two major rail projects in Los Angeles County. This federal funding will benefit both the Regional Connector and Westside Purple Line Extension (Sections 1 and 2) transit projects. Specifically, the federal government will be providing US$100 million to the Regional Connector and US$200 million for the Westside Purple Line section 1 and 2 extension this federal fisca