Skip to main content

Philippines Skyway 3 project to start by end 2013

The Philippines’ government has recently approved a US$612 million contract for the Metro Manila Skyway (MMS) Stage 3 Project which will connect the Southern Luzon Expressway to the Northern Luzon Expressway. The flood free, mostly elevated six lane expressway, is approximately 14.2 kilometres long and is expected to reduce congestion and reduce travel times on major roads in Manila.
October 3, 2013 Read time: 1 min
The Philippines’ government has recently approved a US$612 million contract for the Metro Manila Skyway (MMS) Stage 3 Project which will connect the Southern Luzon Expressway to the Northern Luzon Expressway.

The flood free, mostly elevated six lane expressway, is approximately 14.2 kilometres long and is expected to reduce congestion and reduce travel times on major roads in Manila.

The project will commence before the end of the year and will be fully funded by the Citra Central Expressway Corporation and will be overseen by the Department of Transportation and Communications and the Toll Regulatory Board (TRB).

Related Content

  • China Yuchai announces new gas engine development project
    March 22, 2012
    China Yuchai International has announced that its main operating subsidiary, Guangxi Yuchai Machinery Company Limited (GYMCL) has inaugurated a new project to develop and produce a full portfolio of natural gas powered engines to complement its existing suite of diesel engines. In recent years, the policies of the Chinese government have encouraged energy conservation and emissions reduction.
  • Positive outlook for Q-Free
    August 15, 2013
    Q-Free reported revenue of US$25 million for the second quarter 2013, an increase of 29 per cent from the same quarter last year. Operating profit (EBIT) improved to a positive US$51,000 from an operating loss of US$3.8 million in the same period last year. Loss before tax was reduced to US$391,000 from a loss of US$3.9 in the second quarter 2012. The improved earnings mainly reflect changes in the revenue composition, with higher product and service and maintenance revenue.
  • Orange County awards $1.4 million traffic signal synchronisation project
    July 3, 2014
    Iteris has expanded its relationship with the Orange County Transportation Authority (OCTA) with the award of a US$1.4 million contract to provide traffic signal improvements. The project is part of the renewed Measure M regional traffic signal synchronisation program, which was approved by voters in 2006 for a 30-year extension. Measure M is the half cent sales tax for transportation improvements that was initially approved by Orange County voters in 1990, and was renewed by voters for a 30-year extensi
  • Illinois EPA funds cleaner transport options in Chicago area
    December 13, 2018
    The Illinois Environmental Protection Agency (EPA) has pledged approximately $19 million in its first round of funding to help transit agencies invest in cleaner modes of transport. This initial round has been distributed to local companies as part of the Driving a Cleaner Illinois Programme – an initiative which seeks to improve air quality in the state by removing old diesel engines from service. Funding is expected to provide clean air benefits for working families and children in ‘environmental jus