Skip to main content

Fluor JV to build Texas expressway

A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst
June 1, 2015 Read time: 2 mins
A 2248 Fluor-led joint venture, Colorado River Constructors, a partnership with 3902 Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the 5681 Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas.

According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s.

The joint venture will design and reconstruct approximately eight miles of US Highway 183 from US Highway 290 in Austin, to State Highway 71 near the Austin Bergstrom International Airport. The project is expected to break ground in 2016 with construction set to continue into 2020.

The Bergstrom Expressway Project will add capacity to one of Austin’s most important arterial roadways which serves more than 60,000 vehicles a day. The project scope of work includes the design and construction of six tolled lanes (three in each direction) located in the median of US 183, upgrades to the general purpose lanes, five grade-separated interchanges, four new bridges, two new direct connect flyover ramps and the installation of intelligent traffic management systems. Improvements and upgrades to major interchanges along the corridor such as bike and pedestrian sidewalks with shared-use paths are also included.

“The Fluor-Balfour joint venture is proud to have been selected for this contract continuing our 14-year relationship with Balfour in Texas. We look forward to successfully delivering the project in partnership with the Mobility Authority,” said Terry Towle, president of Fluor’s infrastructure business. “

For more information on companies in this article

Related Content

  • Joining old and new in Canada’s Highway 407
    June 17, 2016
    David Arminas visits Canada’s Highway 407 ETR to see how the concession is working and hear about new arrangements for the roadway’s extension. The Toronto region is North America’s eighth largest metropolitan area and its roads become notoriously congested. In 1997 Highway 407, a 68km concrete toll motorway which skirts the northern edge of Toronto, was opened and initially operated by the province and CHIC - a consortium of four leading Ontario-based companies. Finance came from the Ontario Financing Auth
  • Heading the right way with Caltrans
    October 27, 2020
    Wrong-way collisions are relatively rare – but they are often head-on and fatal. After recent studies, California DoT is reviewing its highway design standards
  • Oh dear - and micromobility had been going so well…
    October 7, 2020
    Rides on scooters and bikes in 2019 were up 60% on 2018 - but they plummeted after March
  • Continued impact of TEN-T programme
    November 29, 2012
    The Trans-European Transport Network Executive Agency (TEN-T EA) launched for the second year running a campaign aimed at showcasing successfully implemented TEN-T projects. The “ten (more) out of TEN” campaign highlights ten additional TEN-T projects whose successful implementation has yielded regional, national and European added value and which are helping to complete the TEN-T network.