Skip to main content

Fluor JV to build Texas expressway

A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst
June 1, 2015 Read time: 2 mins
A 2248 Fluor-led joint venture, Colorado River Constructors, a partnership with 3902 Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the 5681 Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas.

According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s.

The joint venture will design and reconstruct approximately eight miles of US Highway 183 from US Highway 290 in Austin, to State Highway 71 near the Austin Bergstrom International Airport. The project is expected to break ground in 2016 with construction set to continue into 2020.

The Bergstrom Expressway Project will add capacity to one of Austin’s most important arterial roadways which serves more than 60,000 vehicles a day. The project scope of work includes the design and construction of six tolled lanes (three in each direction) located in the median of US 183, upgrades to the general purpose lanes, five grade-separated interchanges, four new bridges, two new direct connect flyover ramps and the installation of intelligent traffic management systems. Improvements and upgrades to major interchanges along the corridor such as bike and pedestrian sidewalks with shared-use paths are also included.

“The Fluor-Balfour joint venture is proud to have been selected for this contract continuing our 14-year relationship with Balfour in Texas. We look forward to successfully delivering the project in partnership with the Mobility Authority,” said Terry Towle, president of Fluor’s infrastructure business. “

For more information on companies in this article

Related Content

  • Congestion pricing - no such thing as a free ride
    October 2, 2018
    The widespread adoption of autonomous vehicles is likely to increase congestion, many experts believe. But Wes Guckert of Traffic Group believes that tolling could provide the answer. While it is still hard to wrap your head around the idea of getting into a vehicle without a driver, the industry is now used to hearing, reading, participating in the advancement of autonomous vehicles (AVs). Those in the industry have heard about Uber delivering a shipment of Budweiser, or the convoy of driverless trucks
  • Mott MacDonald Grontmij JV wins Highways Agency’s framework contract
    November 20, 2014
    The Mott MacDonald Grontmij joint venture (MMG JV) is to provide professional engineering design services to support strategic investment in England’s road network. The JV has been appointed on Lot 1 of the Highways Agency’s new US$7.8 billion Collaborative Delivery Framework (CDF), the country’s largest ever framework for the improvement of motorways and major A roads. The Highways Agency’s CDF is Collaborative working practices and knowledge sharing between designers, the Highways Agency, delivery part
  • Iteris wins $1.1m smart mobility deal 
    November 12, 2021
    Three-year project supports OCTA’s transportation funding scheme 
  • Siemens completes installation of new LED streetlights for US town
    October 9, 2015
    Siemens has recently completed installation of more than 550 LED streetlights and floodlights in the Town of Hamilton, Massachusetts, on behalf of Metropolitan Area Planning Council, (MAPC). The full project installation is expected to result in at least US$25,000 in annual energy and maintenance savings for the town, reduce energy usage by 60 per cent compared to existing streetlights, and provide citizens with clearer lighting conditions to improve visibility and safety. The project is also expected t