Skip to main content

Fluor JV to build Texas expressway

A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst
June 1, 2015 Read time: 2 mins
A 2248 Fluor-led joint venture, Colorado River Constructors, a partnership with 3902 Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the 5681 Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas.

According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s.

The joint venture will design and reconstruct approximately eight miles of US Highway 183 from US Highway 290 in Austin, to State Highway 71 near the Austin Bergstrom International Airport. The project is expected to break ground in 2016 with construction set to continue into 2020.

The Bergstrom Expressway Project will add capacity to one of Austin’s most important arterial roadways which serves more than 60,000 vehicles a day. The project scope of work includes the design and construction of six tolled lanes (three in each direction) located in the median of US 183, upgrades to the general purpose lanes, five grade-separated interchanges, four new bridges, two new direct connect flyover ramps and the installation of intelligent traffic management systems. Improvements and upgrades to major interchanges along the corridor such as bike and pedestrian sidewalks with shared-use paths are also included.

“The Fluor-Balfour joint venture is proud to have been selected for this contract continuing our 14-year relationship with Balfour in Texas. We look forward to successfully delivering the project in partnership with the Mobility Authority,” said Terry Towle, president of Fluor’s infrastructure business. “

For more information on companies in this article

Related Content

  • Iteris wins ITS integration services contract
    May 18, 2012
    Iteris has been awarded a US$1.4 million ITS integration services contract from the city of Oxnard, in California, for deployment of the city’s ITS Master Plan. Since 2006, the company has been providing ITS services to Oxnard which is the 19th most populous city in California and the most populous in Ventura County. The six-year partnership began with the development of the city’s ITS Master Plan, followed by detailed design of the citywide ITS, and now its integration and deployment.
  • Barrier-free truck tolling for Spain's Basque region
    October 11, 2024
    MLFF system covers 146 lanes and has been processing 1.4 million transactions daily
  • Virginia and Transurban spend $1bn on infrastructure to improve congestion
    January 31, 2019
    The US state of Virginia and road operator Transurban are investing more than $1 billion in four projects to help tackle congestion on the I-495 and I-95. The partners want to establish a 90-mile network of connected Express Lanes throughout Northern Virginia and Fredericksburg by 2022. Virginia Department of Transportation (VDoT) and Transurban have signed an agreement for the first project, Capital Beltway Express Lanes Northern Extension. The new 2.5-mile area will offer four general purpose lanes and
  • Active traffic management increases safety and capacity
    February 2, 2012
    WSDOT is deploying Active Traffic Management in order to increase safety and capacity on its strategic roads. WSDOT's Patricia Michaud elaborates