Skip to main content

Fluor JV to build Texas expressway

A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst
June 1, 2015 Read time: 2 mins
A 2248 Fluor-led joint venture, Colorado River Constructors, a partnership with 3902 Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the 5681 Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas.

According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s.

The joint venture will design and reconstruct approximately eight miles of US Highway 183 from US Highway 290 in Austin, to State Highway 71 near the Austin Bergstrom International Airport. The project is expected to break ground in 2016 with construction set to continue into 2020.

The Bergstrom Expressway Project will add capacity to one of Austin’s most important arterial roadways which serves more than 60,000 vehicles a day. The project scope of work includes the design and construction of six tolled lanes (three in each direction) located in the median of US 183, upgrades to the general purpose lanes, five grade-separated interchanges, four new bridges, two new direct connect flyover ramps and the installation of intelligent traffic management systems. Improvements and upgrades to major interchanges along the corridor such as bike and pedestrian sidewalks with shared-use paths are also included.

“The Fluor-Balfour joint venture is proud to have been selected for this contract continuing our 14-year relationship with Balfour in Texas. We look forward to successfully delivering the project in partnership with the Mobility Authority,” said Terry Towle, president of Fluor’s infrastructure business. “

For more information on companies in this article

Related Content

  • Australian highway upgrade gets under way
    October 31, 2013
    Work has begun on a US$130.8 million major upgrade to the Bruce Highway to increase the route’s capacity in north Queensland. The upgrade will increase seven kilometres of highway from two lanes to four lanes, with major works to be carried out on the intersections at Hunter Street, Abbott Street, Lakeside Drive and Stuart Drive. Federal MP George Christensen says a four lane overpass of the rail line at Cluden will be built to separate traffic from the existing open level crossing to improve safety on
  • Smoothing the path to reducing traffic pollution
    October 22, 2014
    David Crawford reviews a new approach to traffic smoothing. A key objective for the Californian city of Bakersfield’s upgraded traffic operations centre (TOC), which opened in June 2014, is to help improve living conditions in a region with one of the worst air quality problems in the US. The TOC is speeding up the smoothing of traffic flows by delivering faster and better-informed traffic signal retiming and synchronisation.
  • Public transit is weapon in US congestion war
    December 3, 2018
    Public transit is a huge component of US transportation, insists Mary Scott Nabers, CEO of Strategic Partnerships – and infrastructure upgrades have the potential to create thousands of jobs When it comes to public transportation, the US lags far behind other countries. Governments in Europe, Asia and Canada invest heavily in public transportation because it is viewed as an essential public good. The US government, however, views public transit a little differently and funding has been inadequate for d
  • Iteris wins $3.75m traffic info contract for Bay Area
    August 5, 2024
    Firm will provide San Francisco MTC’s 511 Traveler Information telephone system