Skip to main content

Fluor JV to build Texas expressway

A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst
June 1, 2015 Read time: 2 mins
A 2248 Fluor-led joint venture, Colorado River Constructors, a partnership with 3902 Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the 5681 Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas.

According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s.

The joint venture will design and reconstruct approximately eight miles of US Highway 183 from US Highway 290 in Austin, to State Highway 71 near the Austin Bergstrom International Airport. The project is expected to break ground in 2016 with construction set to continue into 2020.

The Bergstrom Expressway Project will add capacity to one of Austin’s most important arterial roadways which serves more than 60,000 vehicles a day. The project scope of work includes the design and construction of six tolled lanes (three in each direction) located in the median of US 183, upgrades to the general purpose lanes, five grade-separated interchanges, four new bridges, two new direct connect flyover ramps and the installation of intelligent traffic management systems. Improvements and upgrades to major interchanges along the corridor such as bike and pedestrian sidewalks with shared-use paths are also included.

“The Fluor-Balfour joint venture is proud to have been selected for this contract continuing our 14-year relationship with Balfour in Texas. We look forward to successfully delivering the project in partnership with the Mobility Authority,” said Terry Towle, president of Fluor’s infrastructure business. “

For more information on companies in this article

Related Content

  • England’s first motorway celebrates 60th birthday with ITS upgrade
    December 5, 2018
    Sixty years today, 2,300 drivers drove along an eight-mile section of road in England – the first motorway in the country. Opened in 1958, the Preston bypass – now part of the M6 - only had two lanes in each direction, with no safety barrier in the central reservation. There was also no technology – not even simple electronic signs. Highways England is pledging to celebrate the birthday by completing four upgrades on the M6 by spring 2022. The £900m project will add extra lanes and better technolog
  • Meridiam consortium named preferred proposer for Virginia's transform 66 project
    December 12, 2016
    A consortium of Meridiam, Cintra, Ferrovial Agroman US, Allan Myers VA, Janssen & Spaans Engineering, the Louis Berger Group and American Structurepoint has been named Preferred Proposer by the Commonwealth of Virginia for the State’s Transform 66 Project. I-66 Express Mobility Partners will design, build, finance, maintain and operate the I-66 Outside the Beltway project under the Public Private Partnership (P3) Transportation Act. The project is designed to relieve congestion, improve safety and provi
  • Improving urban traffic control in Atlanta
    January 27, 2012
    Hugh Colton, Georgia DOT details move to improve urban traffic control in the Atlanta area. With a significant proportion of traffic using freeways and toll-ways, along with a significant investment in roadway infrastructure, urban arterials are often the poor relation when it comes to ITS investment. Hitherto the primary means of Urban Traffic Control (UTC) has been the ubiquitous traffic signal. Many traffic signals still operate in a standalone mode and traffic detection is often broken, leaving the sign
  • Kapsch tunnels into US and Brazil
    April 21, 2025
    Projects in Florianópolis & Fort Lauderdale completed - and Hawaii awarded