Skip to main content

Fluor JV to build Texas expressway

A Fluor-led joint venture, Colorado River Constructors, a partnership with Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas. According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s. The joint venture will design and reconst
June 1, 2015 Read time: 2 mins
A 2248 Fluor-led joint venture, Colorado River Constructors, a partnership with 3902 Balfour Beatty Infrastructure, has been awarded a four-year design-build contract by the 5681 Central Texas Regional Mobility Authority to provide design and construction services valued at US$581 million for the Bergstrom Expressway Project located in Austin, Texas.

According to Fluor, the project provides the most significant improvements to the US Highway 183 corridor since the mid-1960s.

The joint venture will design and reconstruct approximately eight miles of US Highway 183 from US Highway 290 in Austin, to State Highway 71 near the Austin Bergstrom International Airport. The project is expected to break ground in 2016 with construction set to continue into 2020.

The Bergstrom Expressway Project will add capacity to one of Austin’s most important arterial roadways which serves more than 60,000 vehicles a day. The project scope of work includes the design and construction of six tolled lanes (three in each direction) located in the median of US 183, upgrades to the general purpose lanes, five grade-separated interchanges, four new bridges, two new direct connect flyover ramps and the installation of intelligent traffic management systems. Improvements and upgrades to major interchanges along the corridor such as bike and pedestrian sidewalks with shared-use paths are also included.

“The Fluor-Balfour joint venture is proud to have been selected for this contract continuing our 14-year relationship with Balfour in Texas. We look forward to successfully delivering the project in partnership with the Mobility Authority,” said Terry Towle, president of Fluor’s infrastructure business. “

For more information on companies in this article

Related Content

  • Golden River Traffic renews contract for road traffic monitoring system
    April 16, 2012
    Golden River Traffic (GRT), part of the Clearview Traffic Group, has successfully renewed a long-term contract to maintain the road traffic monitoring system on the UK’s A1 Darrington to Dishforth DBFO project with Road Management Services (RMS). This contract win is initially for an eight year duration, with the option to extend for up to a further four years. The A1 Darrington to Dishforth DBFO project comprises improvements to and the operation and maintenance of 53kms of the A1(M) / A1(T) between Darrin
  • Canada looks to HOT lanes to tackle congestion
    March 16, 2017
    David Crawford sees an evidence-based approach to HOT lane conversions. Canada’s first high occupancy toll (HOT) lanes opened on 16 September 2016 as a pilot on a 16.5km section of existing high occupancy vehicle (HOV) lanes running in both directions along Toronto’s Queen Elizabeth Way. Promised in two recent budgets
  • Colombia seeks expressions of interest for Bogotá LRT
    December 15, 2014
    Colombia's national infrastructure agency ANI is to hold a public hearing on 16 December to gather expressions of interests for the 43.9 kilometre western corridor of Bogotá's light rail (LRT) project. The two-line LRT system is expected to cost around US$605 million and would stretch between the central station of the Sabana railway to a station located in the municipality of Facatativá. A total of 17 stations are planned for the corridor as well as a branch line to the airport. Around 71.5 million p
  • Consortium named for Pennsylvania PPP bridge project
    January 27, 2015
    A consortium comprising HDR, Plenary Group, Walsh Group and Granite Construction Company has been awarded the contract to replace 558 bridges as part of the Pennsylvania Rapid Bridge Replacement Project in the US. As lead design engineer for the construction joint venture, HDR will be responsible for bridge and roadway design services, environmental permits, right-of-way plan development and construction phase services. The team will begin construction in summer 2015 and complete all bridge replaceme