Skip to main content

Cofiroute USA installs management system for 91 Express Lanes

Cofiroute USA, which introduced toll road automation on the 91 Express Lanes in Orange County, California, has installed a fully integrated back office system as part of a five year US$38.5 million contract awarded earlier this year. The system provides for transponder tracking, accounting, a web-based consumer interface and dynamic pricing capabilities. The company worked with its software partner TollPlus to meet the specific requirements of the Orange County Transportation Authority (OCTA). This include
June 25, 2012 Read time: 2 mins
5938 Cofiroute USA, which introduced toll road automation on the 6021 91 Express Lanes in Orange County, California, has installed a fully integrated back office system as part of a five year US$38.5 million contract awarded earlier this year. The system provides for transponder tracking, accounting, a web-based consumer interface and dynamic pricing capabilities.

The company worked with its software partner TollPlus to meet the specific requirements of the 1768 Orange County Transportation Authority (OCTA). This included designing a system that automated many functions and created efficiencies that will permit OCTA to better track toll revenues and control operating costs over the long term. In addition, the new 91 Express Lanes system from Cofiroute USA interfaces with other toll road systems, including the 5508 Transportation Corridor Agencies and its toll roads, 261, 241 and 73 in Orange County.

With the new system, OCTA can directly perform most functions and has the flexibility to change system details quickly, such as in its congestion pricing model (changing toll fees based on time of day) and language modifications.

“It was a monumental task to switch over from the legacy systems we had in place and we were fortunate to have such great teams from the OCTA and Cofiroute USA working together, even around the clock, to launch the new system,” said Kirk Avila, general manager of the 91 Express Lanes of OCTA.

Related Content

  • TransCore to develop bay area express lane network
    October 7, 2014
    TransCore is to develop, integrate, and maintain a network of express lanes on behalf of San Francisco’s Metropolitan Transportation Commission’s (MTC) Bay Area Infrastructure Financing Authority (BAIFA). The competitively procured US$54.6 million project will see 90 miles of existing high occupancy vehicle (HOV) converted lanes into express lanes on I-680, I-880 and I-80. The aim is to improve connectivity by closing gaps in the existing HOV network and improve freeway efficiency by making the best use
  • Managed lane operators: meet the CAV pioneers
    June 26, 2018
    There is some controversy over the testing of connected and autonomous vehicles – but Robert Deans of Transurban North America explains how managed lanes could be vital in the development of CAVs, benefiting everyone. Managed lane operators have the opportunity to establish themselves as leaders in the testing and roll-out of connected and automated vehicles (CAVs), assisting and accelerating the transition of CAVs onto road networks to deliver economic and safety benefits. Managed lane facilities
  • TransCore to provide AET forOrange County toll roads
    April 17, 2013
    Toll roads in Orange County California are due to go cashless and all-electronic (AET) in the spring of 2014 according to an announcement from the Transportation Corridors Agencies (TCA) which has just has just approved a contracts with TransCore. The contract is for US$36.42 million and provides for provision of a new toll system that is regular AET mix of RFID transponder tolling and image based licence plate reads in an open road setting. TransCore will also maintain the system for ten years. A statement
  • Benefits of traffic light synchronisation
    January 27, 2012
    Alicia Parkway corridor, located in Orange County, California, was part of Phase 1 of an inter-jurisdictional Traffic Light Synchronisation Programme (TLSP) in Orange County designed to increase mobility and overall drive quality while reducing fuel consumption and greenhouse gas emissions. By increasing average speeds and reducing travel times via the reduction in stops, the programme sought to reduce vehicle acceleration and deceleration events along the corridor; these have been identified as the leadin