Skip to main content

Tolling cameras being installed on Ohio rivers project

Tolling won’t begin until late this year, but drivers may soon notice cameras in place on the toll gantry located at the north end of the Abraham Lincoln Bridge, near Court Avenue, on the Ohio Rivers Project in the US. Two cameras are scheduled to be installed for testing as part of preparations for the new RiverLink all-electronic tolling system. Tolling won’t begin until cross-river capacity is added to the system. That means either the improved Kennedy Bridge will be fully open to six lanes of I-65
August 8, 2016 Read time: 2 mins
Tolling won’t begin until late this year, but drivers may soon notice cameras in place on the toll gantry located at the north end of the Abraham Lincoln Bridge, near Court Avenue, on the Ohio Rivers Project in the US.

Two cameras are scheduled to be installed for testing as part of preparations for the new RiverLink all-electronic tolling system.

Tolling won’t begin until cross-river capacity is added to the system. That means either the improved Kennedy Bridge will be fully open to six lanes of I-65 southbound traffic, with six lanes of I-65 northbound traffic on the adjacent Lincoln Bridge, or the new East End Bridge will be open to traffic. Both are expected to happen late this year.

RiverLink is the new, all-electronic tolling system making the Louisville-Southern Indiana Ohio River Bridges Project possible. There are no toll booths, no coin machines, no lines and no stopping. Initial toll rates range from $2-$12. The lowest toll rates are for drivers with transponders. Drivers must set up a prepaid account to get a transponder.

Related Content

  • November 16, 2020
    Free-flow tolls for new £2bn Thames crossing
    More than 27 million drivers annually may use the planned Lower Thames Crossing near London
  • March 20, 2017
    Stocchi takes on transatlantic tolling tasks
    We talk to Emanuela Stocchi, the first overseas-based female president of IBTTA and well placed to view tolling on both sides of the Atlantic. As incoming president of the International Bridge, Tunnel and Turnpike Association (IBTTA), Emanuela Stocchi aims to bolster the ‘international, mobility and connections’ elements of the US-based tolling organisation.
  • December 2, 2015
    TransCore to upgrade toll collection on four bridges between US-Mexico
    The City of Laredo has selected TransCore to provide a comprehensive upgrade to the toll collection system on its four international bridges between the US and Mexico. Each year, more than 6.7 million vehicles and three million pedestrians cross the Gateway to the Americas, the Juarez-Lincoln International, the Colombia Solidarity, and the World Trade bridges. The three-year project, which will be completed in 2018, upgrades both the electronic and cash payment toll collection systems.
  • February 21, 2014
    Caltrans to focus on traffic management in 2014
    Although San Diego County may see a downturn new freeway infrastructure projects during 2014, many projects, from rail to highways and cycle paths, are still in the pipeline for 2014, according to the region's transportation planning agencies. Laurie Berman, district director for the regional office of the California Department of Transportation, said last week that Caltrans' focus is transitioning from general purpose lane expansions to more traffic management. The new direction is meant to provide trav