Skip to main content

Indra to renew Colombia toll systems

Concesionaria del Desarrollo Vial de la Sabana (DEVISAB) has awarded Indra a contract valued at US$2.3 million to renovate the technology used at three toll plazas and a control centre on a roadway linking the municipalities of Chia, Mosquera, Girardot and Soacha. The project is scheduled to be completed in 14 months. Indra will deploy toll and electronic toll systems on 21 collection lanes at the toll plazas of Tebaida, Mondoñedo and the Soacha municipality access lane, along a 159-kilometre stretch of
March 2, 2016 Read time: 2 mins
Concesionaria del Desarrollo Vial de la Sabana (DEVISAB) has awarded 509 Indra a contract valued at US$2.3 million to renovate the technology used at three toll plazas and a control centre on a roadway linking the municipalities of Chia, Mosquera, Girardot and Soacha. The project is scheduled to be completed in 14 months.

Indra will deploy toll and electronic toll systems on 21 collection lanes at the toll plazas of Tebaida, Mondoñedo and the Soacha municipality access lane, along a 159-kilometre stretch of highway running north to south through the Department of Cundinamarca, west of Bogota.

The solution includes an innovative electronic toll system developed by Indra, allowing the concessionaire to manage finances, users, accounts, payment methods and report generation. Indra will also deploy a closed circuit television (CCTV) video-surveillance system for the toll plazas, a license plate recognition system, signalling platforms and other systems.

Related Content

  • March 30, 2017
    Connected citizens boosts Boston’s traffic management
    Data-derived traffic management is starting to show benefits as David Crawford discovers. The city of Boston has been facing growing congestion problems in its Seaport regeneration district, with the rate of commercial and residential growth threatening to overtake the capacity of the road network to respond.
  • May 30, 2014
    ADB to fund Jaipur metro extension
    The Asian Development Bank (ADB) will provide a $176 million loan to construct Jaipur Metro's phase-I (B) project, an additional 2.3 kilometre underground stretch from Chandpole to Badi Chaupar, along with two stations, that should be ready to provide access to the central business district by March 2018. A 9.7 kilometre long elevated line 1 of the metro from Mansarovar in the western part of the city to Chandpole is under construction on the western edge of the central business district and will open by
  • January 25, 2012
    Anywhere card delivers prepaid contactless ticketing
    David Crawford investigates a far reaching initiative in integrated travel. The Port Authority Transit Corporation (PATCO), an operator of high speed commuter rail in the north eastern US, is not one of the world's best known transit providers. Its 13 stations along a single east-west route (three of them interchanges with other regional commuter lines) handle 40,000 passengers a day, travelling to and from Philadelphia, the US' fifth most populous city.
  • April 4, 2023
    Sice systems future proof Fehmarnbelt Tunnel
    Picking up the electro-mechanical contract for the Fehmarnbelt Tunnel was a milestone, according to David Calero Monteagudo, head of global ITS and tunnel business for Spanish company Sice. David Arminas finds out more