Skip to main content

Indra to renew Colombia toll systems

Concesionaria del Desarrollo Vial de la Sabana (DEVISAB) has awarded Indra a contract valued at US$2.3 million to renovate the technology used at three toll plazas and a control centre on a roadway linking the municipalities of Chia, Mosquera, Girardot and Soacha. The project is scheduled to be completed in 14 months. Indra will deploy toll and electronic toll systems on 21 collection lanes at the toll plazas of Tebaida, Mondoñedo and the Soacha municipality access lane, along a 159-kilometre stretch of
March 2, 2016 Read time: 2 mins
Concesionaria del Desarrollo Vial de la Sabana (DEVISAB) has awarded 509 Indra a contract valued at US$2.3 million to renovate the technology used at three toll plazas and a control centre on a roadway linking the municipalities of Chia, Mosquera, Girardot and Soacha. The project is scheduled to be completed in 14 months.

Indra will deploy toll and electronic toll systems on 21 collection lanes at the toll plazas of Tebaida, Mondoñedo and the Soacha municipality access lane, along a 159-kilometre stretch of highway running north to south through the Department of Cundinamarca, west of Bogota.

The solution includes an innovative electronic toll system developed by Indra, allowing the concessionaire to manage finances, users, accounts, payment methods and report generation. Indra will also deploy a closed circuit television (CCTV) video-surveillance system for the toll plazas, a license plate recognition system, signalling platforms and other systems.

Related Content

  • August 9, 2012
    Inauguration of India’s Yamuna Expressway project today
    Efkon India has announced that is has provided design, installation, and commissioning solutions for the three main toll plazas and three ramp toll plazas of the Yamuna Expressway Project (YEP) - a 165km highway stretch connecting Delhi with Agra – that will be inaugurated today. The toll plazas comprise a total of 129 lanes and all main plazas have 32 lanes furnished with fully automatic and semi-automatic fare collection system. The solution includes 24 weigh-in-motion (WIM) systems across all main plazas
  • August 9, 2012
    Inauguration of India’s Yamuna Expressway project today
    Efkon India has announced that is has provided design, installation, and commissioning solutions for the three main toll plazas and three ramp toll plazas of the Yamuna Expressway Project (YEP) - a 165km highway stretch connecting Delhi with Agra – that will be inaugurated today. The toll plazas comprise a total of 129 lanes and all main plazas have 32 lanes furnished with fully automatic and semi-automatic fare collection system. The solution includes 24 weigh-in-motion (WIM) systems across all main plazas
  • August 9, 2012
    Inauguration of India’s Yamuna Expressway project today
    Efkon India has announced that is has provided design, installation, and commissioning solutions for the three main toll plazas and three ramp toll plazas of the Yamuna Expressway Project (YEP) - a 165km highway stretch connecting Delhi with Agra – that will be inaugurated today.
  • April 25, 2013
    Widest bridge in the world Port Mann open in Vancouver
    Port Mann Bridge, designed to growing regional congestion and improve the movement of people, goods and transit throughout greater Vancouver, is now open for business. The widest bridge in the world, the Port Mann Bridge located in the metro Vancouver area, in British Columbia, Canada, features an Open Road Tolling (ORT) system, also called All Electronic Tolling (AET), which will ultimately cross all 10 lanes of traffic.