Skip to main content

Indra to renew Colombia toll systems

Concesionaria del Desarrollo Vial de la Sabana (DEVISAB) has awarded Indra a contract valued at US$2.3 million to renovate the technology used at three toll plazas and a control centre on a roadway linking the municipalities of Chia, Mosquera, Girardot and Soacha. The project is scheduled to be completed in 14 months. Indra will deploy toll and electronic toll systems on 21 collection lanes at the toll plazas of Tebaida, Mondoñedo and the Soacha municipality access lane, along a 159-kilometre stretch of
March 2, 2016 Read time: 2 mins
Concesionaria del Desarrollo Vial de la Sabana (DEVISAB) has awarded 509 Indra a contract valued at US$2.3 million to renovate the technology used at three toll plazas and a control centre on a roadway linking the municipalities of Chia, Mosquera, Girardot and Soacha. The project is scheduled to be completed in 14 months.

Indra will deploy toll and electronic toll systems on 21 collection lanes at the toll plazas of Tebaida, Mondoñedo and the Soacha municipality access lane, along a 159-kilometre stretch of highway running north to south through the Department of Cundinamarca, west of Bogota.

The solution includes an innovative electronic toll system developed by Indra, allowing the concessionaire to manage finances, users, accounts, payment methods and report generation. Indra will also deploy a closed circuit television (CCTV) video-surveillance system for the toll plazas, a license plate recognition system, signalling platforms and other systems.

For more information on companies in this article

Related Content

  • New Mersey crossing ends Halton’s congestion misery
    December 5, 2017
    Plagued by intolerable congestion but denied government funding for its solution, tiny Halton Borough Council relentlessly pursued its vision and achieved what many believed impossible. Halton may be a small local authority in north west England, but it had a big traffic problem. However, as the road, or more particularly the bridge, involved was not deemed a strategic route, central government would not commission or even fund a solution - a problem that many other local authorities will recognise.
  • Video developments in automatic incident detection
    May 22, 2012
    David Crawford reviews technological progress with automatic incident detection Highway safety problems are likely to intensify given recent predictions of future traffic growth across the world. In the United States, the National Highway Traffic Safety Administration (NHTSA) reports that currently over 30,000 deaths and 1.5 million injuries occur as the result of accidents on the nation’s roads each year. These figures will increase with the number of kilometres travelled each year in the US expected to gr
  • Colombia seeks expressions of interest for Bogotá LRT
    December 15, 2014
    Colombia's national infrastructure agency ANI is to hold a public hearing on 16 December to gather expressions of interests for the 43.9 kilometre western corridor of Bogotá's light rail (LRT) project. The two-line LRT system is expected to cost around US$605 million and would stretch between the central station of the Sabana railway to a station located in the municipality of Facatativá. A total of 17 stations are planned for the corridor as well as a branch line to the airport. Around 71.5 million p
  • Integrate systems to reduce roadside infrastructure
    January 27, 2012
    David Crawford reviews promising current developments. Instrumentation of the road infrastructure has grown to become one of the most dynamic sectors of the ITS industry. Drivers for its deployment include global concerns over the commercial and environmental pressures of traffic congestion, the importance of keeping drivers informed throughout their journeys, and the need to reduce accident rates and promote the safety of all road users, for example by enforcing traffic safety rules.