Skip to main content

Upgrade for Queensland motorways

Australian road operator Transurban Queensland has awarded Kapsch TrafficCom subsidiary Kapsch TrafficCom Australia the contract for a new project to fully replace the existing road tolling system for the Gateway and Logan Motorways in Queensland. The scope of the project comprises supply of a new tolling system with 14 tolling points, and is valued at over US$10.5 million (14 million AUD). Kapsch will deliver its latest tolling technology based on the company’s single gantry multi-lane free-flow (MLF
July 11, 2016 Read time: 2 mins
Australian road operator 600 Transurban Queensland has awarded 4984 Kapsch TrafficCom subsidiary Kapsch TrafficCom Australia the contract for a new project to fully replace the existing road tolling system for the Gateway and Logan Motorways in Queensland.

The scope of the project comprises supply of a new tolling system with 14 tolling points, and is valued at over US$10.5 million (14 million AUD).

Kapsch will deliver its latest tolling technology based on the company’s single gantry multi-lane free-flow (MLFF) platform and next-generation stereoscopic vision technology for both vehicle detection and classification (VDC) and automatic number plate recognition (ANPR).

The Gateway (including the Gateway Extension) and Logan Motorways comprise over 60 kilometres of motorway and see daily traffic in excess of 271,000 vehicles. They are part of Transurban Queensland’s go via network of Brisbane toll roads. The Gateway Motorway provides a Brisbane city bypass, north-south connection between the Gold Coast and Sunshine Coast and access to the busy port of Brisbane and airport precincts. The Logan Motorway is located to the south-west of Brisbane City and provides an essential connection between Logan, Brisbane and Ipswich.

For more information on companies in this article

Related Content

  • Progress in talks on new Sydney toll road
    October 10, 2013
    Toll roads operator Transurban says it has made good progress in its talks with the New South Wales government on a US$2.5 billion tunnel proposal for Sydney's north. The proposed project would be a tolled motorway linking the M1 Pacific Motorway, formerly the F3 freeway, at Wahroonga to the M2 toll road at West Pennant Hills. The project involves the construction of new eight kilometre tunnel, which would be the longest tunnel of its kind in Australia. “We have made significant progress in our disc
  • Arctic role for Kapsch on Norwegian ferry traffic
    March 10, 2023
    Multi-lane free-flow automated classification and payment solution run for Torghatten Nord
  • Q-Free unveils QPoint positioning technology during ITS World Congress 2012
    October 23, 2012
    Q-Free ‘s message at this World Congress centres around its global strength and capabilities, underpinned by advanced technology, such as the QPoint positioning technology which is being unveiled here in Vienna. It’s less than a month since the company was awarded a contract for the design, supply and installation of an electronic tolling system for the iconic Sydney Harbour Bridge, just a few months after Brisbane Airport Corporation in Australia appointed Q-Free to design and construct an electronic acces
  • Belarus ETC system starts operations
    August 1, 2013
    The country-wide electronic toll collection (ETC) system is Belarus has begun operations, replacing the manual tolling system on 815 kilometres of the country’s road network. The US$353 million contract was awarded to Kapsch TraffiCom in 2012. The system, based on Dedicated Short Range Communication (DSRC) technology, comprises 56 tolling and enforcement gantries and 48 customer service points, together with two modern data centres were implemented, 500,000 on board units for automatic payment and sixteen