Skip to main content

Kapsch wins $9m Virginia tunnel deal

Tolled parallel tunnel is part of Chesapeake Bay Bridge-Tunnel complex
By David Arminas December 27, 2023 Read time: 1 min
Scada - supervisory control and data acquisition - system will ensure safety in tunnel (image: Kapsch TrafficCom)

Kapsch TrafficCom has won a $9 million tunnel management contract for the tolled Parallel Thimble Shoal Tunnel now under construction in Chesapeake Bay, Virginia.

The parallel tunnel is part of the Chesapeake Bay Bridge-Tunnel, a 28.3km-long (17.6-mile) bridge and tunnel complex that runs across the lower Chesapeake Bay that was opened in 1964 to connect Virginia state’s Eastern Shore.

When complete, the new $755 million parallel tunnel will carry two lanes of traffic southbound and the existing tunnel will carry two lanes northbound.

The technology provided by Kapsch TrafficCom will ensure continued safety in the existing tunnel as well as the new tunnel, with a Scada - supervisory control and data acquisition - system, an electrical power control system and safety features such as fire alarms, generators, CCTV, deluge and fire pumps and other critical hardware and software.

The design-build project is being done by the Chesapeake Tunnel Joint Venture that includes Dragados US, Schiavone Construction as lead contractor and Hatch Mott MacDonald as lead designer. Construction manager is HNTB.

The client is the Chesapeake Bay Bridge and Tunnel District - what is called a “political subdivision” of the Commonwealth (state) of Virginia. 

Related Content

  • June 28, 2016
    Kapsch TrafficCom to upgrade Massachusetts ITMS
    Kapsch TrafficCom North America has secured a four year, US$11.5 million (€10.4 million) contract to upgrade and modernise the integrated transportation management system (ITMS) at the Highway Operations Center (HOC) of the Massachusetts Department of Transportation (MassDOT). The new system will manage all of the Department’s state-wide roadway network and the Boston Metropolitan Highway System tunnel complex and facilities. The next generation ITMS, based on Kapsch’s DYNAC software suite, will efficien
  • February 2, 2012
    BrisConnections selects Kapsch TrafficCom
    Kapsch TrafficCom has been awarded a contract by Thiess John Holland, the design and construction contractor for the Brisbane Airport Link and Northern Busway Project, to deliver an Electronic Toll Collection (ETC) system worth over US$12.25 million.
  • August 20, 2015
    New system to prevent Hazchem and over-height vehicles entering tunnel
    An impending move to free-flow charging prompted a search for automated dangerous goods identification and over-height detection systems at the Thames Crossing to the east of London. Manned toll booths are increasingly being consigned to history by the onslaught of all-electronic charging. However, a secondary function of the traditional manned plazas has been to prevent non-compliant vehicles using the facility or to tell a driver that that they need to use a specific lane or wait for an escort. Automating
  • May 2, 2025
    €5.6m Madrid deal for Kapsch EcoTrafiX
    Agreement includes supply of hardware and traffic control centre maintenance