Skip to main content

Kapsch wins $9m Virginia tunnel deal

Tolled parallel tunnel is part of Chesapeake Bay Bridge-Tunnel complex
By David Arminas December 27, 2023 Read time: 1 min
Scada - supervisory control and data acquisition - system will ensure safety in tunnel (image: Kapsch TrafficCom)

Kapsch TrafficCom has won a $9 million tunnel management contract for the tolled Parallel Thimble Shoal Tunnel now under construction in Chesapeake Bay, Virginia.

The parallel tunnel is part of the Chesapeake Bay Bridge-Tunnel, a 28.3km-long (17.6-mile) bridge and tunnel complex that runs across the lower Chesapeake Bay that was opened in 1964 to connect Virginia state’s Eastern Shore.

When complete, the new $755 million parallel tunnel will carry two lanes of traffic southbound and the existing tunnel will carry two lanes northbound.

The technology provided by Kapsch TrafficCom will ensure continued safety in the existing tunnel as well as the new tunnel, with a Scada - supervisory control and data acquisition - system, an electrical power control system and safety features such as fire alarms, generators, CCTV, deluge and fire pumps and other critical hardware and software.

The design-build project is being done by the Chesapeake Tunnel Joint Venture that includes Dragados US, Schiavone Construction as lead contractor and Hatch Mott MacDonald as lead designer. Construction manager is HNTB.

The client is the Chesapeake Bay Bridge and Tunnel District - what is called a “political subdivision” of the Commonwealth (state) of Virginia. 

For more information on companies in this article

Related Content

  • Conduent makes contact on A24/Blankenburg in Netherlands
    June 13, 2024
    Firm will provide customer contact centre for users of the toll motorway near Rotterdam
  • Comprehensive communications combats tolling resistance
    May 19, 2017
    Toll road operator must provide clear, comprehensive and consistent communications to user groups and the local community long before the facility opens. When new tolled highway infrastructure is about to go into service, the construction, management and finance specialists who brought it into being are about ready for a well-deserved celebration. But for the communications and outreach team responsible for building public support for the project – for bringing drivers to the road, and keeping partners and
  • San Francisco's Presidio Parkway completed
    July 14, 2015
    The long-awaited Presidio Parkway in San Francisco has opened to traffic. The US$1.1 billion project relied on US$363 million in federal funds, as well as US$152.5 million from the American Recovery and Reinvestment Act, and a US$150 million Transportation Infrastructure Finance and Innovation Act (TIFIA) loan. Since work began in 2009, the Presidio Parkway project replaced Doyle Drive, a 1.6-mile segment of SR-101 linking the city to the Golden Gate Bridge, connecting Marin and San Francisco counties, a
  • Early bird deadline is near for Asecap Days 2025
    March 21, 2025
    Check out event before 2 April to take advantage of reduced registration fee