Skip to main content

Upgrading New Yorks's traffic signal timings

The New York City Department of Transportation instituted the Midtown in Motion project to promote multimodal mobility in the Midtown Core of Manhattan, a 110 square block area or “zone” from Second to Sixth Avenue and 42nd to 57th Street. Control extended from 86th Street to 23rd Street, focused on the core zone. MiM provides signal timing changes on two levels: Level 1 control starts from a pre-stored library of timing plans. These are designed offline and are relevant to arterials inside the Midtown stud
February 28, 2013 Read time: 3 mins
The programme of upgrading intersection traffic signals has been one of three main building blocks in New York’s modernization plan (Pic: Aftab Uzzaman)
The 5590 New York City Department of Transportation instituted the Midtown in Motion project to promote multimodal mobility in the Midtown Core of Manhattan, a 110 square block area or “zone” from Second to Sixth Avenue and 42nd to 57th Street. Control extended from 86th Street to 23rd Street, focused on the core zone.

MiM provides signal timing changes on two levels: Level 1 control starts from a pre-stored library of timing plans. These are designed offline and are relevant to arterials inside the Midtown study area. As a result of applying these specially designed timing plans, traffic progression patterns are adjusted, serving the overall purpose of regulating traffic into Midtown, thereby enhancing mobility inside the study area.

Level 1 control of the system alerts operators in the NYCDOT Traffic Management Centre (TMC) to changes in travel time and ve­hicle speed and recommends signal timing adjustments. The opera­tor then reviews video cameras and other sources of information in the vicinity of the flagged avenue to identify the cause for the change in travel time. The TMC supervisor then decides the appropriate course of action to handle the event, which could be signal timing adjustments or requesting that NYPD address the situation.

To evaluate the system’s performance, a comparison of travel time by roadway segments was carried out. Based on the testing to date, in general the average speed improved noticeably. Speeds on approaches to the zone reduced to some degree as expected. Overall (inside and outside the zone) speeds improved, however.

Level 2 control is a split adjustment based on Severity Index (SI) which is related to an estimate of queue length (traffic congestion) by approach. The longer the queue is, the bigger the SI. The control algorithm attempts to reallocate green time between approaches to reduce queuing if possible and to achieve equity between the ap­proaches. Under the current implementation, the splits are adjusted at every third signal cycle.

Level 2 can reduce queuing while achieving equity during the period, where feasible. This will vary by intersection. Level 2 imple­mentation suggests that there are intervals wherein the ‘splits’ (time allocated for the green signal) can be adjusted to better service either the avenue or crosstown street, which is part of the objectives of MiM.

The extensive sensor network is enabling a rich data archive to be built. Combined with the record of actions taken and experience gained, this data will allow new traffic management plans to be de­veloped.

The data now available due to the city’s ITS sensor network, suit­ably analysed and combined with operational experience, confirms a basic principle – that significant variation in the zone is the norm. While there are clear aggregate patterns, daily fluctuations require active traffic management that is designed to anticipate that reality.

  • This is an edited extract from a paper presented by NYCDOT deputy director for systems engineering, Mohamad Talas, at the 19th ITS World Congress in Vienna, Austria, in October 2012. For a copy of the full paper, email %$Linker: 2 Email <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkEmail [email protected] NYCTOT false mailto:[email protected] true false%>.

Related Content

  • August 6, 2015
    Ertico announces fourth eCall testfest
    The fourth Ertico eCall testfest event will be held from 9 to 13 November 2015 in Ostrava, Czech Republic. This event will be hosted by Vítkovice IT Solutions in cooperation with the Ministry of Transport, Ministry of Interior and Fire Rescue Service of the Czech Republic. The testfest enables vendors to run interoperability test sessions within approved guidelines. It also includes debriefing sessions where experts can answer technical questions or solve interoperability issues. In addition, compliancy
  • March 31, 2016
    ITS America 2016 San Jose student essay competition
    The ITS America 2016 San Jose Intelligent Transportation Systems (ITS) Student Essay Competition will be sponsored again this year by Southwest Research Institute (SwRI). The annual prize, to be awarded at ITS America 2016 San Jose on 12 June during the ITS America Board of Directors meeting, encourages post-secondary students to take a leadership role in advancing transportation technology by sharing their own unique concepts and ideas, as expressed via an original essay. The contest is aimed at undergradu
  • May 1, 2019
    Metro to slash greenhouse gas in Washington
    The Washington Metropolitan Area Transit Authority (Metro) has introduced a five-year Energy Action Plan to reduce energy usage and cut greenhouse gas emissions in the US capital. Once fully implemented, it is expected to net $16 million annually in energy cost savings and another $13 million in savings on operations and maintenance expenses by 2025. The plan is part of a commitment by Metro to invest $65m from its capital budget by 2025 in energy efficiency technology, modernise operations and redu
  • March 31, 2016
    MDTA solicits interested parties for third generation electronic toll-collection systems
    The Maryland Transportation Authority (MDTA) has announced that it is seeking comments on two Requests for Proposals (RFPs) to develop and operate the third generation of its electronic toll-collection systems. It has now issued a Request for Comments via eMaryland Marketplace to solicit feedback on the procurement of its toll system and its Customer Service Centre system. The new toll system will include replacement of the existing toll-lane terminals and all associated hardware and software, while the